Course Hero has millions of student submitted documents similar to the one
below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.
Find millions of documents on Course Hero - Study Guides, Lecture Notes, Reference Materials, Practice Exams and more.
Course Hero has millions of course specific materials providing students with the best way to expand
their education.
Below is a small sample set of documents:
Illinois Tech - CM - 13
Hydrogen System Piping and Instrumentation DiagramMatthew HillsHydrogen System P&IDHelium Store Gas Panel VentingVac. PumpsHCryostat Heater/ Chiller UnitHHHydrogen BottleHHMatthew HillsLine Types and Colour CodingNote: This
Illinois Tech - CM - 13
Hydrogen Control SystemMJD Courthold TW Bradshaw Y Ivanyushenkov D BaynhamIntroductionControl System Overview of control system Prototype flow diagrams & control sequences Pumps and Instrumentation Implementation and hardwareOverview of c
Illinois Tech - CM - 13
Can we scale the beamline for different pref settings? ie might it be a reliable way to furnish same n, different momentum beams for MICE?Background: We aim eventually* to cover. (*or for starters!)n=1/small!, p=240MeV/c n=1/small!, p=200MeV/c
Illinois Tech - CM - 13
Low emittance beams and 6 pi workChris Rogers 21 October 2005Overview A bit last minute as I didnt see the agenda until this morning Low emittance beams Issues A first stab 6 pi work Review of previous work Apologies for poor quality of s
Illinois Tech - CM - 13
Status of the MuCool Cavity PrototypeMICE Collaboration MeetingOctober 21, 2005Steve VirostekLawrence Berkeley National LaboratoryProgress Since Last Year Leak check of all e-beam welds was performed Cooling tubes were TIG brazed to cavity e
Illinois Tech - CM - 13
G4Beamline Analysis of the MICE AUG05 Beamline DesignTom Roberts Muons, Inc.TJR 10/21/20051Background This is the AUG05 beamline design from Kevin Tilley and Dean Adams It is quite similar to the SEPT04 design, except: A collimator has been
Illinois Tech - CM - 13
Beamline Parallel - SummaryA new beamline revision has been produced (AUG05) catering for 200MeV/c, 6pi setting.- Basically beamline is shortened by about ~ 2m or so. - TOF0, Ckov1, TOF1 qualitatively maintain their positions wrt triplets. - Coll
Illinois Tech - CM - 13
Project Reportpaul drumm October 2005paul drumm; October 2005; Project Report1Contents Progress and Schedule Risks Procedural matters technical board UK Funds Progress against milestones Critical path items2Progress since Frascat
Illinois Tech - CM - 13
Information Technology ReportYagmur Torun, IIT MICE Collaboration Meeting Oct 22, 2005 - RALMICE Communication Infrastructure So far, we got by with a simple setup on my workstation: Apache webserver on Linux Simple html documents for most con
Illinois Tech - CM - 13
Software StatusMICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis1Software CzarI have replaced Yagmur as the Software Czar as he moves to head the Analysis forum. I would like to thank Yagmur for all the work he has done both
Illinois Tech - CM - 13
RF Status Reportpaul drumm for the DL/ASTeC RF Group October 2005paul drumm; October 2005; G:\CM13\4 RFStatus.odp1 ASTeC/RF group invited to collaboration meeting. Frascati was very nice but. .we should get on with some work2Baseline sch
Illinois Tech - CM - 13
Target test aims The unknowns we need to understand: ISIS beam profile (r,t) and reproducibility beam loss caused by the new target Pion production and limitations because of beam loss What we are not trying to do: It is not the aim to test t
Illinois Tech - CM - 13
MICE Target Design Update and Test PlansChris Booth Sheffield 22nd October 2005Outline Prototype and bench tests Changes to design Preparations for ISIS test, & test aims Outstanding issuesChris Booth University of Sheffield2Progress sin
Illinois Tech - CM - 13
PARTICLEIDCKOV1STATUSREPORTL. Cremaldi, G. Gregoire, D. SummersUM/UCLISIS BeamLN2 Option RICH Option LH OptionAcive aperature +25cm Low energy MICE, 250-300MeV/c MICE Capable of measuring beamline purity. Device should exceed >4.0 ? MICE CO
Illinois Tech - CM - 13
M. Bonesini MICE TOF stations INFN Milano construction & planningM. Bonesini - 22/10/05 RAL1OutlineIntroduction Present design for TOF0 PMTs studies Current problems Funding & timescale Present design for TOF1/TOF2 PMTs studies Open questions
Illinois Tech - CM - 13
MuCal plans after INFN approval02/17/09Pietro Chimenti1MuCal in the MICE environment600 muons in 1 ms spill! Strong B field (~300 Gauss)02/17/09 Pietro Chimenti 21,35 mmBasic design0,9 mm 0.9 mm pitch to the beam1.35 mm pitch of
Illinois Tech - CM - 13
Downstream PID simulationsRikard Sandstrm University of Geneva MICE collaboration meeting 2005-10-22 RALOutline Definitions PID objective Calorimeter Comparison with KLOE data Basic idea for PID variables Time of flight as PID variable Pe
Illinois Tech - CM - 13
KEK test beam - introduction M. YoshidaMICE CM tracker parallel 2005/10/222005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1T585 SetupA. Horikoshi2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 24-Station Tracker Proto
Illinois Tech - CM - 13
Report of the TOF & ACC performanceTOF hodoscope Timing resolution , / particle identify Beam study , Stability of momentum ACCNpe of ACCe/ particle identify (TOF&ACC)Atsushi Horikoshi Osaka-U Thanks for kennichi (ACC&beam study)Setup of SciF
Illinois Tech - CM - 13
Tracking Analysis for beam test T585CONTENTS SETUP MAPPING/ FIBER ALIGNMENT DEAD CHANNEL ANALYSIS 2D TRACKINGP.E. DISTRIBUTION P.E. DISTRIBUTION RECONSTRUCTED EVENT3D TRACKING SETUPBEAM#4 47.5 cm #3 #2 32.5 cm #1 7.3 cm -47.5 cm
Illinois Tech - CM - 13
Cryo and AFE IIt UpdateMICE Collaboration Meeting October 22, 2005 RAL A. BrossCryo Update I The cryo-system for the VLPCs has been operated extremely reliably and stably from May through the end of the KEK TB However, it was felt that the therm
Illinois Tech - CM - 13
MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a QuenchMichael A. Green Lawrence Berkeley LaboratoryMICE Collaboration Meeting 23 October 200523 October 2005 MICE Meeting at RAL 1MICE Channel with the TrackersAFC Module 2 RFCC M
Illinois Tech - CM - 13
MICE Collaboration meeting RAL 21 24 Oct 2005AFC towards manufacturingByWing Lau, Stephanie Yang Oxford University Steve Virostek - LBNLThe exploded view of the components in the AFCStatus of the AFC designThe design is largely complete,
Illinois Tech - CM - 13
Absorber R&D ProgressKEKS. Ishimoto, S. Suzuki K. YoshimuraOsaka Univ. Y. Kuno, A. HorikoshiMICE Meeting at RAL, Oct-23, 2005MICE Absorber System with CryocoolerHe refrigerator L-He Dewar L-N2 Dewar G-He cylinders Exit to cool the transfer
Illinois Tech - CM - 13
The MICE Hydrogen System SummaryTom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton LaboratoryObjectives of R&DThere are two phases to the implementation of the hydrogen delivery syste
Illinois Tech - CM - 13
MICE Beam Line DesignOct 24 th 2005Dean Adams, Kevin TilleyBased on TURTLE element definitions by K Walaron, T Roberts and K TilleyBeam Requirements into Mice SpectrometerP (MeV/c) Case under Study 240 200 140 1 6 10 RMS mmrad To match int
Illinois Tech - CM - 13
K. Long, February 17, 2009Tracker, fabrication plansContents Tracker module integration Tracker Electronics Readout Milestones and plans ConclusionsTracker module integrationDetailing required for: Patch-panel support on magnet en
Illinois Tech - CM - 13
KEK Beam Test for MICE SciFi Tracker- KEK-PS T585 M. YoshidaMICE CM@RAL 2005/10/242005/10/24 MICE CM at RAL, KEK test beam, Makoto Yoshida 1Contents KEK-PS T585 setup Beam properties SciFi tracker (quick) analysis2005/10/24MICE CM at RAL
Illinois Tech - CM - 13
Emittance Calculation Progress and PlansChris Rogers MICE CM 24 September 20051 About the Beard It could have been worse2Overview Talk in detail about how we can do the emittance calculation Sample bunch Remove experimental error (PID & t
Illinois Tech - CM - 13
MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ IssuesJean-Sebastien Graulich, Univ. Genveo Introduction o Mice Control and Monitoring o Detector DAQ o Trigger and data volume o What happened since the DAQ workshop o What will happ
Illinois Tech - CM - 13
Wrap-up and Action ItemsMichael S. Zisman* CENTER FOR BEAM PHYSICS *(with help from A. Bross)MICE Collaboration MeetingRAL October 24, 2005Accelerator and Fusion Research DivisionOutline Introduction Items from Technical Board Cooling Chann
Illinois Tech - PC - 263
Status of Waveguide production Production of internal waveguide for Tracker1 has been completed with new specification (page2). Quality of 25 InternalWG + 5 ExternalWG was checked in Osaka on 28June (page3). Found 7 bad fibers in internal wavegu
Illinois Tech - PC - 263
Cryo UpdateAlan Bross Tracker Phone July 12, 2007Cryo Production cryostats 1 and 2 are complete Cryostat #3 is waiting for cassettes Cryostat #4 still has about 5 days of work left on it before it would be ready for cassettes We have no agreem
Illinois Tech - PC - 263
MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary1Terry Hart, MICE Tracker Meeting, July 12, 2007AFE IIt Firmware ModificationsMemory BankModifications needed for data buffering
Illinois Tech - PC - 228
Reconstruction Unit test has been written for the SciFiDoubletCluster reconstruction. This week we (Michael and Malcolm) will be adding tests for the SciFiSpace Point reconstruction and (crucially) the ScFiKalTrack reconstruction. When this is compel
Illinois Tech - PC - 228
A bug was found in the code that creates MCParticles. Instead of making one instance per track, each time a track was stepped in G4, a new MCParticle was being made! This was discovered when I attempted to visualise them. The problem is almost fixed
Illinois Tech - PC - 228
CKOV Model StatusHideyuki Sakamoto MICE Software Phone ConferencePhone Conference No228 30 October 20061Contents1. 2. 3. 4. History from PID review CSG/Boolean Solids Example by simple cone Next stepPhone Conference No228 30 October 20062
Illinois Tech - PC - 196
Reconstruction Plans Staged process of building up Reconstruction over the rest of this year Will require modifications to DetModel/EngModel as we migrate to MiceModule. Aron and I will be working on the TOF and SciFi code and once it is stable at
Illinois Tech - PC - 196
Quality Assurance; status18/05/06Takashi Matsushita t.matsushita@imperial.ac.uk Imperial CollegeT. Matsushita 1Station assembly QA /comb - i Comb arrived: 9 May Doublet layer arrived: 15 May Length of the scintillating fibre is about 40cm, s
Illinois Tech - PC - 186
DAQ Statuso Goal for BTF o Status o First results o To be doneApril 2006Jean-Sbastien GraulichSlide 1Goal for BTFStand alone, local DAQDAQ Reduced to minimum:Local Start/Stop of Runs (no remote Run Control -> no DAQ framework, no even
Illinois Tech - PC - 186
Pmts and Scintillatorso Used Material in Geneva - Big Scintillator Slabs + Pmts - XP2972, 1 Pmts + Voltage Divider o Quotation for new ScintillatorApril 2006Jean-Sbastien GraulichSlide 1Big scintillator slabs Scintillator dimension:
Illinois Tech - MICE - 2
Possible 200 MHz Cooling Experiment DesignsR. B. Palmer, R Fernow DRAFT 3 9/21/01 AbstractTwo possible magnetic designs for a 200 MHz cooling experiment are suggested. Both cases are based on 2 cells of the Study II 2.75 m SFOFO lattice, with up to
Illinois Tech - PC - 339
Analysis PC Schedule 2008Tuesdays fortnightly 9 September 23 September 2 October CM22 11 November 25 November 9 December 23 December11 Nov 2008PC 3391JC - Schedule etc. MR - Beam characterisatiion with TOFs DF - Spectrometer alignment
Illinois Tech - PC - 328
Analysis PC Schedule 2008Tuesdays alternate weeks 15 July Cancelled almost everyone away 29 July 12 August 14 August 26 August 4 September Analysis workshop, RAL CR08 9 September 23 September 7 October possible clash with Oxford annual project
Illinois Tech - PC - 328
G4MICEvsICOOLComparisonChrisRogers, ASTeC, RutherfordAppletonLaboratoryOverviewGeometryModelPrettyPics G4MICEofficialGEANTreleaseisG4.8.1 IwantaccesstosomefeaturesinG4.8.2 Beryllium LiH Be+LiHMaterialModelforGEANT4.8.2 Geo
Illinois Tech - PC - 328
Use of TOFs for Beam measurementAnalysis workshop, RAL 4 September 2008 Mark RaynerMark Rayner, Analysis meeting 9 September 08: Use of TOFs for Beam measurement, slide 1Early beam diagnostics with the TOFs: For each muon Use timing measuremen
Illinois Tech - PC - 328
3D Model of MICE + Hall shields and beams etc. (From Jim Rochford) Everything shown is either coil or ferromagnetic Compare field components Bx,By, Bz on axis with and without the iron Difference = Error field on axis9 Sept 2008 PC 3281Bz on axi
Illinois Tech - PC - 328
ErrorFieldsduetoIronChrisRogers, ASTeC, RutherfordAppletonLaboratoryOverview Firstlookatthis. Fieldmap(c/oJohnCobb+JimRochford) Trackingresults ReferenceParticle VariousbeamsEarlydays!FieldMapsTake2mapsfromJimRochford(Oper
Illinois Tech - PC - 154
Controls Review Want to record a full configuration of the experiment at every possible event, including controls data.Controls Monitoring Event trigger = accelerator clock (or something very close) Systematics handles: Using the beam itself:
Illinois Tech - PC - 241
Ken LongSubject: Entry Type: Start: End: Duration: Tracker Phone call Wed 24/01/2007 13:28 Wed 24/01/2007 13:28 0 hoursTracker analysis phone call: 24Mar07; 13:30 GMT Present: GB, KL, TM, MT, PK, MY, HS, TO, AB, GH, 1. Discussion on connectors (Al
Illinois Tech - PC - 241
KEK Beam test analysisHideyuki Sakamoto 24th January 2007MICE Tracker Phone Meeting 24th January 20071Analysis status Studying the difference of the position of Pt in the vertical direction. Why only in vertical? To solve this, I have checked
Illinois Tech - PC - 271
Analysis PC Schedule 2007Tuesdays alternate weeks, 15:30 17:00 GMT, with ad hoc exceptions Tue 3 April Tue 17 April Tue 1 May Tue 15 May Thu 24 May CM18: Plenary Session Friday 15 June 16:00 18:00 with phone connection Tue 10 July Tue 24 July - ca
Illinois Tech - PC - 271
MICE input beam and weightingDr Chris Rogers Analysis PC 05/09/2007OverviewRecap - MICE input beam alignment & matching X, y, px, py misalignment effect on cooling Energy misalignment effect on cooling Beta, alpha mismatch effect on cool
Illinois Tech - PC - 271
Some recent + ongoing developments in G4MICE Simulation and AnalysisDr Chris Rogers Analysis PC 04/09/2007Recent updates Wedges for 6D cooling Multipoles for beamline simulationOngoing, almost finished Plot 1D, 2D histos at a plane For many
Illinois Tech - PC - 344
Tracker 2 Electronics UpdateLinda R. Coney Terry Hart Ben Freemire Malcolm EllisCassette Characterization Cryostat #4 Cassette 102 Cassette 110 Cryostat #3 Cassette 109 Cassette 104 Done finished at the end of last week Everything l
Illinois Tech - PC - 344
Tracker 1 Cosmic Ray Data Nothing new on the hardware side. Hideyuki has generated new decoding files to correctly describe the mapping for each of the 3 states that we have taken data in with tracker 1 in R8 (original, moved waveguides at VLPC end
Illinois Tech - PC - 243
beam to MICE - ICOOL simulationM. Apollonio University of Oxfordmarco apollonioBeam Optics Meeting (5/1/2007)1 used a beam from Kevin T. (sept 2006): ~2900 muons <Pz> ~ 202 MeV/c, after the diffuser in the centre of the 1st tracker (z=-5.2
Illinois Tech - PC - 149
M. Bonesini MICE TOF stations INFN Milano updates27/6/05 Frascati1Preliminary considerations Background: MICE for INFN is on trackapproval, this means that we have got funds for TOF0 prototypes, EMCAL prototypes now only for 2006 (~310 KE on
Illinois Tech - PC - 149
MICE_EmCalConstruction responsabilities after INFN funding (only) for 2006 Roma III is in charge for : refurbish, secure and restore the lead shaping machines (funds available from November 1st) buy lead foils, plexiglass bars , Bicron glue BC-600
Illinois Tech - PC - 149
Downstream PID status reportRikard Sandstrm PID phone conference 2005-10-051Outline Status of calorimeter expected time of flight Field flips Stuff that did not fit in anywhere else Summary2S ta tus o f c a lo r im eter Goals What