8 Pages

PPOP_04.07_-_Insulation_and_Asbestos_Abatement_Procedures

Course: PPOPSERIES 0400, Fall 2009
School: Texas Tech
Rating:
 
 
 
 
 

Word Count: 1667

Document Preview

PLANT PHYSICAL OPERATING POLICY AND PROCEDURE PP/OP 04.07: Insulation, Asbestos Containing Building Materials and Asbestos Abatement Procedures April 17, 2008 DATE: PURPOSE The purpose of this Physical Plant Operating Policy and Procedure (PP/OP) in conjunction with TTU OP 60.08 is to establish policy and provide supervisors and employees guidance for execution of work projects involving insulation removal, and...

Register Now

Unformatted Document Excerpt

Coursehero >> Texas >> Texas Tech >> PPOPSERIES 0400

Course Hero has millions of student submitted documents similar to the one
below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.

Course Hero has millions of student submitted documents similar to the one below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.
PLANT PHYSICAL OPERATING POLICY AND PROCEDURE PP/OP 04.07: Insulation, Asbestos Containing Building Materials and Asbestos Abatement Procedures April 17, 2008 DATE: PURPOSE The purpose of this Physical Plant Operating Policy and Procedure (PP/OP) in conjunction with TTU OP 60.08 is to establish policy and provide supervisors and employees guidance for execution of work projects involving insulation removal, and asbestos containing building material abatement. REVIEW This PP/OP will be reviewed in April of each every four years by the director of building maintenance and construction with input from the manager of environmental health and safety with recommendations forwarded to the managing director for physical plant. POLICY AND PROCEDURE 1. General Policy a. Definitions (1) Asbestos: includes materials with any concentration of the following asbestiform mineral; Chrystotile, Amosite, Crocidolite, Tremolite, Anthophyllite, and Actinolite. Asbestos fibers: asbestos fibers longer than five micrometers. Asbestos containing building materials building materials containing greater than one percent asbestos. (2) (3) b. References (1) U. S. Environmental Protection Agency (EPA) publication EPA 560/5-85-024, revised 11-20-90. U. S. Department of Labor Occupational Safety and Health Administration (OSHA) Title 29 CFR part 1910.1001 revised 7-98, Construction 29CFR 1926.1101, Custodial 40CFR 61 NESHAPS. (2) PP/OP 04.07 April 17, 2008 (3) c. Texas Asbestos Health Protection rules. Page 2 Accountability (1) The Insulation Shop is responsible for the implementation and maintenance of an active insulation, asbestos containing building material abatement program. The overall asbestos management program Texas Tech University is the responsibility of Environmental Health and Safety (EH&S). The insulation shop foreman/tradesman leader will ensure every Physical Plant employee involved with removal, disposal, and/or encapsulation of asbestos will complete annual training requirements for asbestos abatement and use of protective equipment. Because regulatory information is updated rapidly, coordination with EH&S will be initiated each instance work involving asbestos materials is identified. (2) (3) 2. Procedures a. Insulation and Asbestos Containing Building Material Removal (1) Only certified personnel assigned to the Insulation Shop or under the direct supervision of the Insulation Shop will be involved in removing insulation and asbestos containing building materials. Building Maintenance and Construction (BMC) shops will contact the insulation shop foreman for advice and assistance when dealing with any and all type of insulation and building materials. If insulation or building materials are determined to be asbestos, the insulation or building materials will be removed in accordance with approved procedures and regulatory requirements. (2) PP/OP 04.07 April 17, 2008 b. Medical Surveillance Program Page 3 The supervisor will schedule applicable shop personnel for an asbestos physical examination. Asbestos physicals shall be conducted by a board certified occupational medicine physician. The results of asbestos physicals shall be received and reviewed prior to the assignment of work involving the disturbance or potential disturbance of asbestos containing materials. The insulation shop foreman will schedule all post-employment, annual, and separation asbestos physical examinations. All examinations must be in accordance with OSHA Asbestos Standard 29 CFR 1926. 1101, EPA Worker Protection Rule 40 CFR part 763 and the Texas Department of State Health Services as per the Texas Asbestos Health Protection Rules 295.31-295.73. c. Record Keeping and Documentation Permanent personnel records will be maintained on all employees involved with asbestos related activities. This requirement applies to all personnel in the Physical Plant involved in the removal and disturbance of asbestos containing materials. These records will be maintained for 30 years beyond employee's employment separation date. d. Supervision and Training Supervisors and asbestos workers must be trained and licensed annually by the state of Texas before being involved in asbestos abatement projects. All training records will be included in employee's permanent personnel record. e. Worker Protection Approved protective respiratory equipment and required personal protective equipment will be provided by Texas Tech University. Requirements for protective equipment are identified in the EPA, OSHA, the TSHS standards and regulations as well as product manufacturer's material safety data sheets. Guidelines are addressed in TTU OP 60.08 f. Performance of Asbestos Removal/Abatement Projects All asbestos abatement projects will be classified as preplanned or emergency removal. (1) Preplanned abatement projects PP/OP 04.07 April 17, 2008 (a) Page 4 Prior to starting any planned abatement project, EH&S will be contacted by the insulation shop foreman for assignment of a project manager. A joint meeting will be scheduled to define the project scope and procedures to be used. The following personnel will attend: [1] [2] EH&S representative Supervisors with personnel assigned job duties on the specified project Insulation Shop foreman Academic Support and Facilities Resources Director Auxiliary facility manager (if required) Job-site abatement supervisor Building users (if required) Mechanical Superintendent (b) [3] [4] [5] [6] [7] [8] (c) The appropriated funds for each fiscal year will be encumbered on a BMC customer project request (CR). Each individual insulation removal or abatement project will be identified, controlled, planned, and scheduled using a separate CR. The insulation shop foreman/tradesman leader will prepare a submittal for the specified project, which shall include scope of work, work practices, and project checklist. It shall be submitted to the assigned manager. (d) PP/OP project 04.07 April 17, 2008 Page 5 (e) The Insulation Abatement Shop foreman/tradesman leader will notify EH&S at least twelve(12) working days before the start of any planned abatement project for which the amount of asbestos containing materials to be disturbed is equal to or greater than 160 square feet, 260 linear feet, or 35 cubic feet. The 12 working day period will permit EH&S personnel to submit a properly prepared notification to state and federal regulatory agencies. For those projects for which the amount of asbestos containing material to be disturbed is less than 160 square feet, 260 linear feet, or 35 cubic feet, the notification period shall be five (5) working days. The foreman/ tradesman leader will schedule the projects at the BMC weekly scheduling meeting and coordinate with other shops as required. It is the responsibility of the assigned BM&C foreman/tradesman leader to insure that any such scheduling and coordination is conducted prior to the initiation of work activities. The Insulation/Abatement Shop foreman/tradesman leader will comply with the established federal and state regulations for preparing the work area, initiating the approval work practices and installation of any required engineering controls prior to beginning abatement activity. Abatement work will be performed in accordance with state and federal regulations as well as all applicable TTU operating policies and procedures. It is the responsibility of the designated asbestos supervisor assigned to each of the projects involving asbestos abatement to advise the foreman/tradesman leader of any change in conditions during the implementation of the asbestos abatement work. (f) (g) (h) (i) (2) Small emergency jobs (a) When immediate asbestos abatement is necessary because of a utility failure or accidental fiber release, the insulation /Abatement shop foreman/tradesman leader and EH&S will be contacted for evaluation and scheduling of the work. PP/OP 04.07 April 17, 2008 (b) (c) Page 6 Work orders will be issued separately for each abatement job. The insulation shop foreman will implement the required work practices and engineering controls required for proper completion of the emergency work. EH&S will provide any required notification to EPA and TDH-Asbestos for the emergency situation. Remaining procedures will be followed as outlined in paragraph f. (1) (f-h) above. (d) (e) (3) Special handling procedures for asbestos containing roofing materials (a) State licensure for the removal of asbestos containing roofing materials and asbestos contaminated roofing material is not required. However, specific personnel training requirements must be met based on the type, quality, and removal techniques. Roofing material will be cut and removed using wet methods. The Insulation Shop foreman will be notified by the Physical Plant project manager or the Facilities Planning and Construction project manager at least two working days in advance when the asbestos containing roofing materials will be ready for proper disposal. The contractor must take proper care when lowering asbestos containing materials to the ground to prevent any contaminant release or other unsafe condition. (b) (c) g. Waste disposal The job site asbestos abatement supervisor will notify EH&S prior to removal of any asbestos from the job site or from the primary location of the BM&C asbestos waste storage container. The Insulation/Abatement Shop foreman/tradesman leader will provide a waste manifest to EH&S 48 hours prior to any scheduled off campus disposal date. The following steps will be taken for disposal of asbestos-containing waste. (1) The Insulation/Abatement Shop foreman/tradesman leader will ensure that each employee understands the appropriate labeling PP/OP 04.07 April 17, 2008 techniques, wet methods, and packaging procedures. Page 7 (a) All asbestos-containing waste must be made thoroughly wet or at least to the extent the asbestos material will absorb water. As the asbestos is being removed and placed into bags the material should be kept as damp as possible. Approved disposal bags will be used at all times. The bag is considered full when it is half filled because asbestos saturated with water will be relatively heavy. Excess air must be vacuumed out of bags before they are sealed with duct tape. Bags will be placed in sealed metal containers and/or an enclosed trailer double-lined with 6 mil poly sheeting. (b) (2) Transportation to disposal site (a) The Insulation/Abatement Shop foreman/tradesman leader will be responsible for the Asbestos Transporter License held by the University for the purpose of transporting its waste. The Insulation/Abatement Shop foreman/ tradesman leader is responsible for the maintenance of required licensure. Asbestos transporters will: [1] [2] Comply with federal regulations. Provide personal protective equipment for employees who will be handling asbestos and training for its use as well as supervise their compliance. Establish and maintain records (number of bags, quantity of material, dates items put into waste storage location, locations asbestos containing building materials were taken from) of storing and transporting asbestos waste to disposal site. Train employees in compliance with OSHA regulations outlined in 29 CFR 1910.120 (A) (V) in anticipation of possible asbestos spills. (b) [3] [4] (c) Waste from large abatement projects will be taken directly to the disposal site by the abatement personnel. No more than a 30-day accumulation of asbestos waste will be stored on PP/OP 04.07 April 17, 2008 campus. Page 8 RESPONSIBILITIES POSITION Director for Building Maintenance and Construction SECTION Review MONTH April (Every 4 Years) Approved: ____________________________ Reviewer Approved: ____________________________ Director for Physical Plant PP/OP 04.07
Find millions of documents on Course Hero - Study Guides, Lecture Notes, Reference Materials, Practice Exams and more. Course Hero has millions of course specific materials providing students with the best way to expand their education.

Below is a small sample set of documents:

Texas Tech - PPOPSERIES - 0200
PHYSICAL PLANT OPERATING POLICY AND PROCEDURE PP/OP 02.06: DATE: PURPOSE The purpose of this Physical Plant Policy and Procedure (PP/OP) is to establish policy for a Hazard Communication Program. It will also provide guidance for compliance with requ
Texas Tech - PPOPSERIES - 0500
Gas Procurement Flow ChartProcess should be started 60-90 days prior to end of existing contract. Process is completeSignatures are obtained Contact GLO and coordinate requirements and delivery capabilityPrepare 4 sets of legal document and deli
Texas Tech - PPOPSERIES - 0200
PHYSI CAL PL ANT OPERATI NG POL I CY AND PROCEDUREPP/OP 02.04: DATE: PURPOSE The purpose of this Physical Plant Operating Policy and Procedure (PP/OP) is to provide the guidelines necessary to train all new and transfer employees on the health and s
Texas Tech - PPOPSERIES - 0800
PHYSICAL PLANT OPERATING POLICY AND PROCEDURE PP/OP 08.11: DATE: PURPOSE The purpose of this Physical Plant Operating Policy and Procedure (PP/OP) is to establish procedures for the creation and budgeting of capital projects and capital expenditures
Texas Tech - PPOPSERIES - 0400
PHYSICAL PLANT OPERATING POLICY AND PROCEDURE PP/OP 04.08: DATE: PURPOSE The purpose of this Physical Plant Operating Policy and Procedure (PP/OP) is to document established procedures for routine inspection of aboveground storage tanks by Physical P
Texas Tech - ETD - 08012005
NUMERICAL EXAMPLES OF OUTPUT REGULATION FOR WAVES AND BEAMS by VIJAY MOSES DEV JOHNSON, M.E. A THESIS IN MATHEMATICS Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements for the Degree of MASTER OF SCI
Texas Tech - ETD - 07312008
EVALUATING PREDICTORS OF PHYSICIAN VISITS AMONG CHILDREN WITH SYMPTOMS OF DIABETESby GIRIKUMAR VENATI, M.D.A THESIS IN HEALTH SERVICES RESEARCH Submitted to the Graduate Faculty of Texas Tech University Health Sciences Center in Partial Fulfillme
Texas Tech - ETD - 07312008
PRESCRIPTION DEVELOPMENT FOR BURNING TWO VOLATILE FUEL TYPES by BRENT RACHER, B.S., M.S. A DISSERTATION IN RANGE SCIENCE Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements for the Degree of DOCTOR OF
Texas Tech - ETD - 07312008
INVESTIGATION OF AN ADVANCED TECHNIQUE TO SELECT AN OPTIMAL INHIBITION AND REMOVAL METHOD OF PARAFFIN DEPOSITION IN OIL WELLS by BIKRAM M. BARUAH, B.Tech.A THESIS IN PETROLEUM ENGINEERING Submitted to the Graduate Faculty of Texas Tech University i
Texas Tech - ETD - 07312008
CONTEXTUALIZING CORMAC MCCARTHY'S BORDER TRILOGY: AN ANNOTATIVE APPROACHbyJAMES LUTHER BELL, B.S., M.A.A DISSERTATION IN ENGLISH Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements for the Degree
Texas Tech - ETD - 07312008
ASYMPTOTIC, SPECTRAL, AND NUMERICAL ANALYSIS OF AN AIRCRAFT WING MODEL IN SUBSONIC AIRFLOW by CYNTHIA A. MARTIN, B.S. A DISSERTATION IN MATHEMATICS Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements
Eckerd - HD - 208
Chap 7: Maternal, Infant, and Child HealthInstructors Name Semester, 200_Chap 7: Maternal, Infant, and Child HealthIntroductionMaternal, infant, and child health are important to a community health: 1. Important indicators of the effectiveness
Eckerd - TH - 161
STAGECRAFT161AInstructor Office Office HoursRickTetrault TheatreOfficeofftheCostumeShop M&F912Phone Email8270 tetraurh@eckerd.eduGoals: Togivestudentsageneraloverviewofthebasicsandevolutionoftechnicaltheatre. Toinstructstudentsintheprocedur
Eckerd - WH - 182
WHGC2 SECTION 23 ~ Meese & ClassmatesSupplement to the Syllabus for Our SectionPlease note that this supplement provides specific information for our section only and is an extension of the Syllabus for Western Heritage in a Global Context, Spring
Eckerd - BI - 424
Developmental Biology BI 424 Spring 2007 Instructor: Denise B. Flaherty, Ph.D. x8304, SHB105, cell phone:727-366-0345 flaherdb@eckerd eduCourse Objective : This course investigates cellular, genetic and molecular mechanisms that regulate animal deve
Texas Tech - ETD - 07312008
AGRICULTURAL MECHANIZATION SKILLS NEEDED BY SECONDARY AGRISCIENCE TEACHERS IN TEXAS by JOHN ROBERT BARTON, B.S.A THESIS IN AGRICULTURAL EDUCATION Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements
Texas Tech - ETD - 01292009
^COMPETENCIES NEEDED BY SECONDARY STUDENTS FOR CAREER PREPARATION AND SUCCESSFUL EMPLOYMENT IN INTERGENERATIONAL PROFESSIONS by LYNN PERRIN, B.S. A THESIS IN HOME ECONOMICS EDUCATION Submitted to the Graduate Faculty of Texas Tech University in Par
Texas Tech - ETD - 09262008
NURSING CURRICULUM: CONTENT NEEDED FOR HOME HEALTH NURSING CAREbyPHYLLIS KARMELS, B.S., M.A., M.S.N. A DISSERTATION IN HIGHER EDUCATION Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements for the D
Texas Tech - ETD - 03312007
BASIC SKILLS AND AREAS OF EXPERTISE NEEDED BY C.A.O.S AT COMMUNITY COLLEGES by LLOYD STEVE CHAMBERS, B.S., M.S. A DISSERTATION IN HIGHER EDUCATION Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements f
Texas Tech - ETD - 06272008
HABITAT USE BY THE RIO GRANDE TURKEY ON THE SOUTHERN COASTAL PLAIN OF TEXAS by ELIZABETH J. WILBANKS, B.S.A., B.S.F.R.A THESIS IN WILDLIFE SCIENCE Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements
Texas Tech - ETD - 08272008
TTUSM BURN ENTARCHITECTURE 422 NOLAN EDWARD BROWN DECEMBER 9, 1975TABLE OF CONTENTS INTRODUCTION ACTIVITIES AND RELATIONSHIPS FINANCING CLIMATOLOGY SITE INFORMATION APPENDIX "A" (Excerpts from Uniform Building Codes) APPENDIX "B" (Excerpts from Lu
Texas Tech - ETD - 09262008
SELECTION OF CASTOR WITH DIVERGENT CONCENTRATIONS OF RICIN AND RCA USING RADIAL IMMUNODIFFUSION by SCOTT DAVIS PINKERTON, B.S. A THESIS IN CROP SCIENCE Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requireme
Texas Tech - ETD - 06272008
KEEP THE DRAMA ON THE STAGE: WRITING AN AUTOBIOGRAPHICAL PLAY by ELIZABETH CASTILLO, B.A. A THESIS IN THEATRE ARTS Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements for tiie Degree of MASTER OF FINE
Texas Tech - ETD - 04022008
FORECAST VERIFICATION: A DISPERSION MODELING PERSPECTIVE by RACHEL ROGERS-VAN NICE, B.S. A THESIS IN ATMOSPHERIC SCIENCE Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements for the Degree of MASTER OF
Texas Tech - ETD - 02122007
REPRODUCTIVE ECOLOGY, HABITAT ASSOCIATIONS, AND POPULATION DYNAMICS OF TWO IMPERILED CYPRINIDS IN A GREAT PLAINS RIVER by BART WILLIAM. DURHAM, B.S., M. S. A DISSERTATION IN FISHERIES SCIENCE Submitted to the Graduate Faculty of Texas Tech University
Texas Tech - ETD - 09262008
JUVENILE DELINQUENCY AND LEARNING DISABILITIES: THE CONTRIBUTION OF NEGATIVE AFFECTIVITY AND HIGH AROUSABILITY by SHELLY WILSON HOOK, B.S., M.A. A DISSERTATION IN PSYCHOLOGY Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfil
Texas Tech - ETD - 08272008
A Conununity R e c r e a t i o n Center forThe Parks and Recreation Department City of Fort Worth, Texas by James Edward Ledoux A Thesis In Architecture Submitted to the Architecture Faculty of the College of Architecture at Texas Tech University Pa
Texas Tech - ETD - 01292009
PHYSIOLOGICAL AND SENSORY CHARACTERISTICS OF SHEEP EXPRESSING THE CALLIPYGE PHENOTYPE by CHRISTOPHER R. KERTH, B.S. A THESIS IN ANIMAL SCIENCE Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements for t
Texas Tech - ETD - 09262008
IDENTIFICATION OF PROTEINS FROM Erwinia chrysanthemi INVOLVED IN ANIMAL PATHOGENESISbyC. TODD ANDERSON, B.A. A THESIS IN MICROBIOLOGY Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements for the Deg
Texas Tech - ARCH - 391
Architecture of the AutomobileBy Robert T. ShultisArchitecture of the Automobile A Museum for Las Cruces New MexicoIdentificationA museum for Las Cruces New MexicoRobert T. Shultis Master Design Studio Spring 2008Architecture of the Auto
Texas Tech - ARCH - 5395
Architecture of the AutomobileBy Robert T. ShultisArchitecture of the Automobile A Museum for Las Cruces New MexicoIdentificationA museum for Las Cruces New MexicoRobert T. Shultis Master Design Studio Spring 2008Architecture of the Auto
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
T e iSae n: h s ttme t s D a i o teg o g a a dmin c ne t f nae frn p ai i te rwn n h e l i l n n g o tx o a ra o i i t n n h g oc i sr o d s no afci c npo u ea ac i c rl r ta is s i b , x ei t l e i f a iy a rd c n rh e t a f m h t u t n l e p r ni,
Texas Tech - ARCH - 5395
T e iSae n: h s ttme t s D a i o teg o g a a dmin c ne t f nae frn p ai i te rwn n h e l i l n n g o tx o a ra o i i t n n h g oc i sr o d s no afci c npo u ea ac i c rl r ta is s i b , x ei t l e i f a iy a rd c n rh e t a f m h t u t n l e p r ni,
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
"An Architecture of Geology"Contextualism in the design for a research facility and observatory, for Hidalgo County, New Mexico.By Brenda Gomez Submitted to the College of Architecture of Texas Tech University in Partial Fulfillment for the Degree
Texas Tech - ARCH - 5395
"An Architecture of Geology"Contextualism in the design for a research facility and observatory, for Hidalgo County, New Mexico.By Brenda Gomez Submitted to the College of Architecture of Texas Tech University in Partial Fulfillment for the Degree
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 391
Texas Tech - ARCH - 5395
Texas Tech - ARCH - 5395
Embracing the ElementsSustainability and Design Manipulation to Affect Human BehaviorMarisol Sifuentes Spring 2008 Professor:Gary Smith Advisor: Scott SchellhaseEmbracing the Elements By Marisol Sifuentes A Thesis in Architecture Submitted to th
Texas Tech - ARCH - 5395
i n d u s t r y . d e c a y . a r t i f a c t .an inquiry into industrial decaying landscapesj eff s. nesbi tFigure .00: Imperial Sugar Factory world referenceINDUSTRY. DECAY. ARTIFACTby Jeff S Nesbit A Thesis in Architecture Submitted to the
Texas Tech - ETD - 08272008
RESIDENTIAL ADOBE ARCHITECTURE AROUND SANTA FE AND TAOS FROM 1900 TO THE PRESENT by HAMIYET OZEN, B.S. in Arch. A THESIS IN ARCHITECTURESubmitted to the Graduate Faculty of Texas Tech Unlversity in Partial Fulfillment of the Requirements for the De
Texas Tech - ETD - 07172007
RELATIONAL DATABASE FOR ECUADORIAN MAMMALS DEPOSITED IN MUSEUMS AROUND THE WORLD by JUAN PABLO CARRERA ESTUPIAN, B S. A Thesis In MUSEUM SCIENCES Submitted to the Graduate Faculty of Texas Tech University in Partial Fulfillment of the Requirements fo