2 Pages

Kataoka

Course: JK 15, Fall 2009
School: Wisconsin
Rating:
 
 
 
 
 

Word Count: 996

Document Preview

Scrambling, Formal/Syntax resumption and scope of Neg It has been observed that the scope relation between Neg and QP is ambiguous (Kuno 1980) ((1)). The ambiguity continues to obtain in the 'scrambled' counterparts ((2)). However, the ambiguity disappears in (3); cf. (2b). In this paper I will provide an account of the absence of the Neg>QP reading in (3) and explore its implications. It has been agreed...

Register Now

Unformatted Document Excerpt

Coursehero >> Wisconsin >> Wisconsin >> JK 15

Course Hero has millions of student submitted documents similar to the one
below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.

Course Hero has millions of student submitted documents similar to the one below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.
Scrambling, Formal/Syntax resumption and scope of Neg It has been observed that the scope relation between Neg and QP is ambiguous (Kuno 1980) ((1)). The ambiguity continues to obtain in the 'scrambled' counterparts ((2)). However, the ambiguity disappears in (3); cf. (2b). In this paper I will provide an account of the absence of the Neg>QP reading in (3) and explore its implications. It has been agreed that the 'scrambled object' in Japanese (henceforth ScramObj) shows A'-properties (e.g., reconstruction effects as in (4a)) and A-properties (the absence of weak crossover effects as in (4b)) (Saito 1992, Ueyama 1998, among others). One might thus attribute the absence of Neg>QP in (3) to the blocking of 'quantifier-lowering' by Neg for the A-moved NP (May 1997), under the thesis, pursued in Miyagawa 2001, for example, that the A-properties of ScramObj come from A-movement. As Lasnik and Saito (1991) suggest, LF-lowering of the A-moved subject is blocked by the negative predicate; while (5a) allows the reading in (6a) (May 1977), (5b) does not allow the reading in (6b). Thus the absence of Neg>QP in (3) can be accounted for if we assume that the ScramObj with A-properties (henceforth A-ScramObj) is moved to its surface position by A-movement from its theta-position inside the VP (or vP), provided that Neg is in the VP-adjoined position at LF. This account crucially relies on the thesis that A-properties come from A-movement. The A-movement analysis, however, faces a serious problem if we consider the observation involving 'resumption'. As in (7), what appears to be resumption is possible (e.g., Hoji 2003) (cf. (4b)), but not in (8) (cf. (4a)), and crucially the object in (7) cannot be in the scope of Neg ((9)). Thus 'resumption' seems compatible with A-properties but not with A'-properties. This observation is problematic to the A-movement analysis of the A-ScramObj since it is inconsistent with the general assumption that A-movement does not leave resumption. If we adopt the base-generation analysis of Ueyama 1998 for the A-ScramObj, on the other hand, the possibility of the 'resumption' is precisely what is expected, as discussed in Ueyama 1998, and Hoji 2003. Given the base-generation analysis, the absence of Neg>QP in (3) is also as expected; the A-ScramObj in (3) is never in the c-command domain of Neg throughout the derivation but the intended 'binding' would require that the ScramObj originate in the object position inside the VP. If the intended 'binding' is eliminated, Neg>QP is available, as seen in (2b). Finally, the absence of Neg>Q in (3) argues against Saito's (2003) derivational account of the ambiguous status of ScramObj; under Saito 2003, nothing prevents a given ScramObj from exhibiting A-properties and A'-properties simultaneously since the relevant formal relation underlying those properties can be established/licensed derivationally; cf. Mahajan 1991. We can also construct a similar argument based on scope interpretation, making crucial reference to the availability of scope reconstruction depending on the presence/absence of 'resumption', and the availability of Neg>QP, corroborating the conclusion reached above; see (10)-(11). (1) a. b. (2) a. b. (3) (4) a. b. (5) a. (6) a. b. (7) [QP itutuizyoo-no ginkoo ]-ga 5:or:more-GEN bank-NOM Toyota-ni Toyota-DAT yuusisi-nak-atta (koto) finace-Neg-Past (Comp) 'Five or more banks did not finance Toyota.' 5-or-more>Neg, Neg>5-or-more UFJ-ginkoo-ga [QP itutuizyoo-no kigyoo ]-ni yuusisi-nak-atta (koto) UFJ Bankt-NOM company-DAT 5:or:more-GEN finance-Neg-Past (Comp) 'UFJ Bank did not finance five or more companies.' 5-or-more>Neg, Neg>5-or-more Toyota-ni [QP itutuizyoo-no ginkoo ]-ga yuusisi-nak-atta (koto) Toyota-DAT 5:or:more-GEN bank-NOM finace-Neg-Past (Comp) (QP>Neg, Neg>QP) [QP itutuizyoo-no kigyoo ]-ni UFJ-ginkoo-ga yuusisi-nak-atta (koto) 5:or:more-GEN company-DAT UFJ Bankt-NOM finance-Neg-Past (Comp) (QP>Neg, Neg>QP) [Itutuizyoo-no kigyoo]QP1-ni [ soko-no torihiki-ginkoo]-ga yuusisi-nak-atta. 5:or:more-GEN-company-DAT it-GE-dealing:bank-NOM finance-Neg-Past 'To five or more companies, its own bank did not finance.' with BVA, *Neg > QP1 Sokoi-no torihikisaki-ni [itutuizyoo-no kigyoo]QP1-ga kitaidoori tousisi-ta. it-GEN client-DAT 5:or:more-GEN company-NOM expectedly invest-Past 'To itsi client, [each of five or more companies]i invested expectedly.' ok BVA [Itutuizyoo-no kigyoo]QP1-ni sokoi-no torihikisaki-ga kitaidoori tousisi-ta. 5:or:more-GEN company-DAT it-GEN client-NOM expectedly invest-Past 'To [each of five or more companies]i, itsi client invested expectedly.' ok BVA Someone is likely to address the rally. / b. Someone is unlikely to address the rally. It is likely that someone will address the rally. It is unlikely that someone will address the rally. [Itutuizyoo-no kigyoo]QP1-ni sokoi-no torihikisaki-ga kitaidoori soko-ni tousisi-ta. 5:or:more-GEN company-DAT it-GEN client-NOM expectedly it-DAT invest-Past 'To five or more companiesi, itsi client invested to it expectedly.' (with BVA) (FN. The 'resumption' is accepted by the majority of the speakers who I have consulted with (9 out of 14) although some find it less than perfect.) (8) (9) (10) *Sokoi-no torihikisaki-ni it-GEN client-DAT [itutuizyoo-no kigyoo]i-ga 5:or:more-GEN bank-NOM it-GEN client-NOM kitaidoori expectedly soko-ni it-DAT it-DAT tousisi-ta. invest-Past invest-Neg-Past [Itutuizyoo-no kigyoo]QP1-ni 5:or:more-GEN company-DAT sokoi-no torihikisaki-ga kitaidoori expectedly soko-ni tousisi-nak-atta. soko-ni it-DAT with BVA(QP1, soko), * Neg > QP1, ok QP1 > Neg [Mittuizyoo-no kigyoo]Q...

Textbooks related to the document above:
Find millions of documents on Course Hero - Study Guides, Lecture Notes, Reference Materials, Practice Exams and more. Course Hero has millions of course specific materials providing students with the best way to expand their education.

Below is a small sample set of documents:

Wisconsin - JK - 15
Functional/Discourse The Korean topic marker nun revisited: nun as a tying devicePrevious research on `topic' has touched on a variety of functional and interactional properties of topicality which shed light on the discourse function of the Korean
Wisconsin - JK - 15
Formal/Semantics-PragmaticsTemporal Order in Japanese Toki-ni Sentences: An Event-Structural AccountThis is an exploratory study of a proper characterization of temporal inferences of toki-ni "when" (lit. "time-at") in Japanese. To capture the dis
Wisconsin - JK - 15
Formal/phonology,phonetics On neutral vowels in Korean vowel harmony Korean exhibits an interesting vowel harmony as in (1) (Sohn 1999). It is a (nonautomatic) assimilatory process whereby one vowel becomes harmonious with another one in the neighbor
Wisconsin - JK - 15
Psycholinguistics/Sentence Processing Gap-filling vs. filling gaps: Event-related brain indices of subject and object relative clauses in Japanese Using event-related brain potentials (ERPs), we investigated the processing of Japanese subject versus
Wisconsin - CATJ - 2008
The 20th Conference of the Central Association of Teachers of JapaneseMay31June1,2008 UniversityofWisconsinMadisonCATJ 20Papersubmissionform1. Presenter(s)Name in English Name in Japanese Affiliation/Name of the school Mailing Address Email ad
Wisconsin - CATJ - 2008
The Style Shift between Boku & OreKenji Endo University of Wisconsin - Madison1Personal E-mail Same social context Same speaker/writer Same addressee However.,Style shift between boku and ore2Research Question What do people with the st
Wisconsin - CATJ - 2008
Advanced language education in the US New media literacies and the 21st century language learnerCATJ 2008 | University of Wisconsin May 30th, 2008 Steven L. Thorne Department of Applied Linguistics Center for Advanced Language Proficiency Education
Wisconsin - CATJ - 2008
Noriko HanabusaUniversity of Notre DameNao Hayashi OtsukaOak Park and River Forest High SchoolMotivationHow can we foster learners oral proficiency towards a more advanced level?Motivation (Cont.)Limited class time - curriculum pressure
Wisconsin - JK - 15
Functional/Acquisition The acquisition of noun-modifying clauses in Japanese: A comparison with Korean Although many studies investigated the acquisition of relative clauses (RCs) of postnomial RC languages, not many studies investigated prenominal R
Wisconsin - ECON - 101
Econ 101: Prof. KellyReview List First MidtermFall 2003Review List First Midterm This handout is meant to be just an outline of the material covered for the first midterm. All the topics that are highlighted here should be in your notebook an
Wisconsin - ME - 232
ME232 CAM HandoutBackground Information: A cam is a component on which a particular profile has been machined. The profile of the cam imparts (causes) a follower to move in a particular way. This can be seen if we examine the diagram below. As the s
Wisconsin - ME - 232
ME232 Constraint ExerciseAnswer Sheet Name: Section:1) What is the total number of Degrees of Freedom (DOF) which exist for this sketch before any constraints are applied?2) What number of DOF does constraining this point account for?3) Number
Wisconsin - ME - 232
Unigraphics Wireframe Construction TutorialThis tutorial will step you through the process to construct a wireframe model of the geometry depicted above. The purpose of this exercise to is help familiarize you with the commands and menus of the Uni
Wisconsin - ME - 232
UG Exercise #6This will be a short exercise which will utilize the EXTRUDE and REVOLVE commands to create solid geometry. Start a new file and name it "exercise6". Set the APPLICATION to MODELING. Go to PREFERENCES > WORK PLANE and enable and displa
Wisconsin - ME - 232
ME232 Bi-Linear Surface ProblemGiven: A bi-linear surface defined by the following four points;Point AX = 4.500 Y = 0.875 Z = 0.000 X = 0.000 Y = 1.000 Z = 8.000 X = 6.500 Y = 4.375 Z = 0.000 X = 4.000 Y = 8.000 Z = 8.000Point BPoint CPoin
Wisconsin - ME - 232
ME232 Constraint AssignmentExercise Instructions: This exercise is intended to enhance your understanding of the application and effects of geometric and dimensional constraints in a sketcher, and to give you experience in the use of modeling system
Wisconsin - ME - 232
ME232 Constraint AssignmentName SectionExtruding the cross-section below created the solid shown at right. A constraint-based sketcher system was used to create the cross-section. Follow the instructions given and answer the following. 1) What is
Wisconsin - ME - 232
ME232 Geometric Modeling for Engineering Applications Parametric Line ProblemGiven: line AB defined by end points A (2,6,0) and B (12,2,0) and line CD defined by endpoints C (1,1,0) and D (9,7,0)Line CD is to be TRIMMED with respect to line AB (i
Wisconsin - ME - 232
Me232 Constructive Solid Geometry ProblemMany components created in mechanical design include fillet and round features. These may be the result of fabrication process (casting, molding, etc.), used to reduce stress concentrations, or to enhance fl
Wisconsin - ME - 232
Transformations ExerciseThis exercise will require you to perform mathematical calculations of transformations using matrix algebra and to verify them using the Unigraphics system. If you need to review the mathematical procedures of using matrices,
Wisconsin - ME - 232
ME232 Intersection of Two Surfaces ProblemGiven: Two interesecting bi-linear surfaces P(u,v) and Q (s,t) defined by their vertices (as shown with coordinates listed below) and with parameterization directions as indicated on the figure.Surface P P
Wisconsin - ME - 232
ME 232 Visualization of Solids Through Boolean OperationsThe Boolean (regularized) operations of Union, Difference and Intersection are integral components of Set Theory and common to solid modeling. An understanding of the operations is essential t
Wisconsin - ME - 232
Wisconsin - ME - 232
ME232Assignment #1Adjustable-pitch Propeller BladeReproductions of the section profiles: Given on the following pagers are representations of the section profiles shown on the propeller blade drawing. The order of the representations are from l
Wisconsin - ME - 232
ME232 Bracket Design ProblemAs part of your bracket design you are required to detail the dependencies and relationships between features and constraints that you have created in designing this component. To do this you are to create a Feature Depen
Wisconsin - ME - 232
ME232 Cam Design ProblemThe motion (opening and closing) of a valve is to be controlled by a cam and knife-edge follower. The cam is rotating at 1 revolution per minute. The total displacement of the valve is 1.5 inches. The base diameter of the cam
Wisconsin - ME - 232
ME232 Assignment #1 Surface Model of an Adjustable Pitch PropellerAssignment Suggestions Creating the Curves Create the curves in the absolute CS and oriented to absolute X. The axis of the blade will then extend in the Z-axis. Rotate the curves to
Wisconsin - PCW - 2007
Signed ClassAds and Restricted DelegationI an D. Alde an rm C pute S nce De om r cie s partm nt e Unive rsity of Wisconsin-Madison alde an@ rm cs.wisc.e du http:/www.cs.wisc.e du/condorC ondor We k 2007 ewww.cs.wisc.edu/condor2Security Issue
Wisconsin - ENGR - 397
Just a collection, no particular order. http:/www.civilproject.com/ http:/www.nsf.gov/home/grants/grants_prep.htm http:/www.pprc.org/pprc/rfp/archives/epasocio.html http:/fdncenter.org/pnd/rfp/ http:/www.pprc.org/pprc/rfp/rfp.html http:/www.dot.state
Wisconsin - ENGR - 397
Workplace Communication Presentation (WCP) JobsheetAssignment: You and your partner(s) will deliver a 10-15 minute interactive presentation on an approved topic related to a workplace communication or writing development issue. All partners should p
Kettering - PHYS - 302
PHYS-302 Physics of Waves 2007 catalog data: Credit: (4-0-0-4) Prerequisites: PHYS-224, Electricity and Magnetism; PHYS-225, Electricity & Magnetism Laboratory; MATH-203, Multivariate Calculus Corequisites: MATH-204, Differential Equations and Laplac
Kettering - IE - 4
<TITLE> A thesis written at <EMPLOYER NAME> and submitted to KETTERING UNIVERSITY in partial fulfillment of the requirements for the degree of BACHELOR OF SCIENCE IN <DEGREE> by <STUDENT NAME> <Month & year of graduation>AuthorEmployer AdvisorF
Kettering - IE - 4
Third Annual Kettering/GMI Alumni Frankenmuth Snowfest BreakfastWhen: Time: Cost: Saturday, January 24, 2009 9:30 a.m.11 a.m. $8 per person $5 children 12 and under Where: NEW LOCATION Zehnders of Frankenmuth 730 South Main Street Frankenmuth, MI 48
Kettering - IE - 4
Kettering - IE - 4
You're Invited . . .The Kettering/GMI Alumni Association and the Indianapolis Alumni ChapterInvite you to lunch and 18 holes of golfBear Slide Golf Club6770 E. 231st Street Cicero, IN 46034Monday, June 16, 2008Lunch begins at 11 a.m. followed
Kettering - IE - 4
The Kettering Office of Alumni Affairs, Nathan Wilke `84 and The North Carolina Alumni ChapterInvite you and your guests to join us for a fun-filled evening at the ballpark!Friday, June 6, 2008Game Time 7:05 p.m. Dinner at the Home Run patio at 6
Kettering - IE - 4
Dual Masters Degree ProgramMBA with Lean Manufacturing ConcentrationandMS in Manufacturing OperationsIn a competitive environment that constantly transforms itself, the key element that will define your success in life is to distinguish yourself
Kettering - IE - 4
Service
Kettering - IE - 4
Departmental Leadership
Kettering - IE - 4
University Leadership
Kettering - IE - 4
University Service
Kettering - IE - 4
Leadership
Wisconsin - ECE - 902
ARA The Ant-Colony Based Routing Algorithm for MANETs Mesut G nes, Udo Sorges, Imed Bouazizi u {mesut, udo, imed }@i4.informatik.rwth-aachen.de Department of Computer Science, Informatik 4 Aachen University of Technology Aachen, GermanyAbstract
Wisconsin - BIRTHTO - 3
Identify and Express EmotionsDoes This Sound Familiar?Teaching Your Child to:Maggie is playing with her four-year-old son. He selects a truck puzzle and begins matching and placing the pieces in the holes. He has a difficult time turning a pie
Wisconsin - PHYS - 103
Physics 103, Midterm Exam 1, Spring 2005 Instructions 1. 2. 3. 4. 5. Use X5 answer sheet Use No. 2 pencil Fill in your Last Name, First Name, MI Fill in your 10 digit UW Student ID (Very Important) Work out the problems, draw pictures, on this exam
Wisconsin - PHYS - 103
Physics 103, Midterm Exam 1, Spring 2005 Solution 1) Tiger Woods and Vijay Singh tee off at Augusta by striking their golf balls. The balls first hit the course at exactly the same spot and then make it into the hole. From this observation we can con
Wisconsin - PHYS - 103
Physics 103: Lecture 6Newton's LawsqTodays lecture will be on Concepts of Mass and Force Newtons Three Laws04/20/09Physics 103, Spring 2007, U. Wisconsin1Review: 2D Motionqx= x0 + v0xt + 1/2 axt2 = v0x + axtqy= y0 + v0yt + 1/2q
Wisconsin - CS - 887
887 Spring '03HOMEWORK assignment 1, due Monday, 10 Feb 03(1) Prove: If (pn : n IN) is a sequence of polynomials that converges uniformly on [a . . b] to some f , then supn deg pn = . (2) Prove: If U is a linear positive operator on C[a . . b]
Wisconsin - CS - 887
887 Spring '03HOMEWORK assignment 5, due Monday, 31 Mar 03As with all homework, you are free to turn to the available literature for help, as long as you follow accepted scientific practice of acknowledging such help in your write-up. (1) Prove t
Wisconsin - WORKSHOP - 3
Generation of Simulated GIFTS DatasetsDerek J. Posselt, Erik R. Olson, and Jim DaviesCooperative Institute for Meteorological Satellite Studies, Space Science and Engineering Center, University of WisconsinMadisonD. PosseltMURI Spring Workshop
Wisconsin - WORKSHOP - 2
MURI Co-I Internal Coordination Meeting MURI Web Site (will E-Mail its address) Share of data & S/W Exchange Ideas/Information MURI FTP Site (will E-mail its address) Delivery Data Transfer Progress Report Annual (end of your proposed PY)
Wisconsin - WORKSHOP - 2
University of Wisconsin - Madison (UW) University of Hawaii (UH) Texas A& M (TAMU) University of Colorado at Boulder (CU) University of Alabama in Huntsville (UAH)MURI"Physical Modeling for Processing Geosynchronous Imaging Fourier Transform Spec
Wisconsin - BME - 300
Progress Report 12: November 30 December 6 Title: Client: Advisor: Team Members: Device to monitor/control differentiation of stem cells to pancreas Victoria Browning Ph.D. Naomi Chesler Ph.D. Dhaval Desai (Communications) Kyle Herzog (Team Leader)
Wisconsin - BME - 310
BME310 hour exam 3, 5/5/04Open book, open notes, 60 minutesPoint count shown in parentheses (20). I suggest that you spend no more than 5 min on 10-point questions, etc. Read each word carefully. Write the equation, substitute values, calculate r
Wisconsin - BME - 310
BME310 hour exam 2, 3/2/08 Open book, open notes, 50 minYour graderExam question e5Your grade out of 5.0Your last name on every pagePoint count shown in parentheses (2.0). I suggest that you spend no more than 12 min on each question. Read
Wisconsin - BME - 310
BME310 hour exam 2, 4/2/98, open book, open notes. 60 min. Short phrase answers are fine provided they respond to the question. 1 Draw the block diagram for the automatic indirect oscillometric (not auscultatory) peripheral blood pressure measurement
Wisconsin - BME - 310
BME310 Hour exam 1, 2/18/99, open book, open notes, 50 min. Short phrase answers are fine provided they respond to the question. Show all work. 1 2 3 4 5 6 7 8 (10 pt) For an x-ray image calculate the number of x-ray photons required per pixel (pictu
Wisconsin - ENGR - 310
University of Wisconsin Department of Biomedical Engineering Medical Instrumentation Lab John G. Webster webster@engr.wisc.edu 608-263-15745-1ElectrocardiogramIntroduction Each time the heart beats, the contracting muscle generates potentials. T
Wisconsin - ENGR - 462
ECE 462 hour exam 2, 11/1/01Open book, open notes, 50 minutesPoint count shown in parentheses (20). I suggest that you spend no more than 10 min on 20point questions. Short phrases of key words are enough for descriptions. State any assumptions.
Wisconsin - ENGR - 462
ECE 462 hour exam 2, 11/7/95Open book, open notesPoint count shown in parentheses (10). I suggest that you spend no more than 5 min on 10-point questions, 10 min on 20-point questions, etc. Short phrases of key words are enough for descriptions.
Wisconsin - ENGR - 462
ECE 462 hour exam 3, 12/12/91Open book, open notesPoint count shown in parentheses (10). I suggest that you spend no more than 5 min on 10-point questions, 10 min on 20-point questions, etc. Short phrases of key words are enough for descriptions.