6 Pages

52228

Course: PDF 2000, Fall 2009
School: GWU
Rating:
 
 
 
 
 

Word Count: 1684

Document Preview

SERVICES ARMED BOARD OF CONTRACT APPEALS Appeal of -Ortech, Inc. Under Contract No. N62472-96-M-3239 APPEARANCE FOR THE APPELLANT: ) ) ) ) ) ASBCA No. 52228 Mr. Dogan Uyger Vice President Arthur H. Hildebrandt, Esq. Navy Chief Trial Attorney Ellen M. Evans, Esq. Trial Attorney Engineering Field Activity Chesapeake Washington, DC APPEARANCES FOR THE GOVERNMENT: OPINION BY ADMINISTRATIVE JUDGE DICUS This appeal...

Register Now

Unformatted Document Excerpt

Coursehero >> District of Columbia >> GWU >> PDF 2000

Course Hero has millions of student submitted documents similar to the one
below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.

Course Hero has millions of student submitted documents similar to the one below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.
SERVICES ARMED BOARD OF CONTRACT APPEALS Appeal of -Ortech, Inc. Under Contract No. N62472-96-M-3239 APPEARANCE FOR THE APPELLANT: ) ) ) ) ) ASBCA No. 52228 Mr. Dogan Uyger Vice President Arthur H. Hildebrandt, Esq. Navy Chief Trial Attorney Ellen M. Evans, Esq. Trial Attorney Engineering Field Activity Chesapeake Washington, DC APPEARANCES FOR THE GOVERNMENT: OPINION BY ADMINISTRATIVE JUDGE DICUS This appeal is taken from a contracting officer' decision denying the claim of s appellant Ortech, Inc. (Ortech) for an equitable adjustment of $54,300.36. The underlying contract is for the upgrading of a neutralization basin at the Naval Air Station, Lakehurst, New Jersey. We deny the appeal. FINDINGS OF FACT 1. Contract No. N62472-96-M-3239 was awarded to Ortech on 27 September 1996 for the fixed-price of $84,480. The contract incorporated the Disputes (OCT 1995) (Alternate I) (DEC 1991) clause at FAR 52.233-1, and the Changes and Changed Conditions (APR 1984) clause at FAR 52.243-5, which requires the contractor to submit any proposals for adjustment to the price or performance period prior to final payment. Other clauses included the Inspection of Construction (JUL 1986) clause at FAR 52.24612 and the Warranty of Construction (MAR 1994) clause at FAR 52.246-21, under which the contractor warrants the work for one year after final inspection. The original completion date for the contract was 10 February 1997. (R4, tab 1) 2. The contract price was increased to $101,265 and the completion date was extended to 20 June 1997 by Modification Nos. P00001-P00003, all of which were bilateral (R4, tab 2). 3. An underground leak was detected during construction. Upon investigation it was determined the leak was caused by Ortech connecting a water line into the pipe leading to the neutralization building without capping the pipe. In a 15 May 1997 letter, Ortech was required to, and did, return and cap the pipe. (Tr. 26-28, 101-04; R4, tabs 68, 122) Ortech' 27 May 1998 claim letter lists this as the basis for item No. 1 (R4, tab s 122). 4. Ortech installed 2 new solenoid valves upstream of an existing backflow preventer valve. The system did not work and Ortech was ordered to remove the existing valve at no cost to respondent in a 22 May 1997 letter. (R4, tab 72; tr. 31-32, 96, 104-05) Ortech' 27 May 1998 claim letter lists this as the basis for claim item No. 2 (R4, tab s 122). 5. The contract required a strip chart recorder to permanently record pH readings (tr. 36-37). Ortech could not find an American-made recorder and informed respondent on 18 February 1997 (R4, tab 51). A recorder was approved on 3 April 1997 which may not have been American-made (R4, tab 60; tr. 105-06). According to Ortech' vice s president, Dogan Uyger, this delayed Ortech' performance of the contract. Ortech s sought a 90 day extension by letter of 16 May 1997 (R4, tab 70; tr. 105-07) Ortech' s 27 May 1998 claim letter lists this as the basis for claim item No. 3 (R4, tab 122). 6. On 30 June 1997 Ortech sent a FAX to respondent seeking a response to appellant' request for information regarding possible modification of the sequence s control panel. Dogan Uyger of Ortech informed respondent of his plans for a vacation commencing 10 July 1997 and stated he would like the proposed change to be completed by that time (R4, tab 80). On 2 July 1997 Mr. Uyger sent another FAX with a circuit design for the changes to the sequence control panel (R4, tab 81). Ortech submitted a proposal in the amount of $2,896.36 for the proposed change on 8 July 1997 (R4, tab 82). On 9 July 1997 Mr. Uyger sent another FAX to respondent requesting an answer on its proposal as soon as possible (R4, tab 83). Later the same day Mr. Uyger sent yet another FAX to respondent stating he was leaving for vacation at noon on 10 July 1997 and needed to know no later than 10:00 a.m. on 10 July 1997 whether respondent wanted Ortech to do the work. By return FAX respondent informed Ortech that it would "accomplish the proposed work by other means." (R4, tab 84) The work was subsequently performed by Ortech' electrical subcontractor under another contract at a s price lower than proposed by Ortech (tr. 107-09). Ortech' 27 May 1998 claim letter lists s this as the basis for claim item No. 4 (R4, tab 122). 7. Ortech made various requests for final inspection starting in June 1997 (tr. 111). Final inspection was held 9 October 1997 (R4, tab 99). A punch list containing 7 items was issued on 9 October 1997 (R4, tab 100). Ortech' 27 May 1998 claim letter s 2 lists refusal to schedule final inspection until 9 October 1997 as claim item No. 61 (R4, tab 122). 8. Ortech' subcontractor installed an air solenoid valve that malfunctioned, s which was identified on the punch list. Ortech' subcontractor returned and cleaned out s the line to which the valve had been installed on 14 November 1997 and the system worked thereafter (R4, tab 100; tr. 111-12). Ortech' 27 May 1998 claim letter lists this s as the basis for claim item No. 7 (R4, tab 122). 9. Ortech installed stainless steel piping and an acid flow meter. Sometime prior to 9 July 1997 the acid became cloudy and, after several attempts at repair, it was discovered that the connection to the acid line was incorrect. Ortech' subcontractor s connected the line properly in March 1998. (R4, tabs 85, 114, 122; tr. 113-15) Mr. Uygar believes respondent should have discovered the cause of the problem at the outset (tr. 15). There is no evidence the that defect was discoverable from a reasonable inspection, and the failure of appellant or its subcontractor to find the problem after several attempts at repair is evidence to the contrary. Ortech' 27 May 1998 claim letter s lists this as the basis for claim item No. 8 (R4, tab 12). 10. On 26 September 1997 Ortech submitted a full release acknowledging payment of $91,058 and a balance remaining of $10,207 (R4, tab 124). By letter of 15 January 1998 the contract work was accepted with an effective date of 20 June 1997 (R4, tab 116). On 3 February 1998 the contracting officer authorized final payment of $10,207 to Ortech, which Ortech accepted (R4, tab 123; complaint). It is not disputed that Ortech received final payment, which it used to pay its subcontractors (tr. 10-12, 15-16). 11. On 27 May 1998 appellant submitted a claim in the total amount of $54,300.36. The claim, which did not seek a time extension, was comprised of the following items: 1. 2. 3. 4. 6. 7. 8. Underground water leak Solenoid valve Strip chart recorder Sequence control panel Refusal of final inspection Solenoid valve malfunction Leak in stainless steel piping and flowmeter coloring Total $ 5,895.00 1,898.00 3,000.00 2,896.36 19,000.00 2,756.00 18,855.00 $54,300.36 1 There is no claim item No. 5. 3 (R4, tab 122) There is no evidence the claim items were brought to respondent' s attention prior to submission of the claim. There is no evidence the contracting officer knew of or is chargeable with knowledge of any claim items prior to the claim. Moreover, the contracting officer testified, and we find, that exception of claim items in the release would not have affected final payment (tr. 145-46). 12. The claim was denied in a final decision dated 9 April 1999 (R4, tab 121). An appeal was filed on 11 June 1999. DECISION Ortech contends, in effect, that the contract was constructively changed and that it should be compensated. Respondent, in its answer, states that the claim is barred by acceptance of final payment without reservation of any claims in the release executed in conjunction therewith. We agree with respondent. Ortech has acknowledged receipt of final payment prior to submission of its claim. There is no evidence that Ortech reserved any of the items in the claim now before us and no evidence that the contracting officer was aware of or is properly chargeable with knowledge that Ortech was asserting a right to additional compensation at the time of final payment. Indeed, Ortech seems to argue that it had no choice but to submit it' s release and invoice for final payment without assertion of any right to additional compensation because it feared that assertion of a perceived right to additional compensation would delay final payment (finding 11). However, we have found that final payment would not have been affected by Ortech' reservation of the claims in the s release (id.). The burden is on the contractor to identify and specify exceptions to the release prior to final payment, and the failure to do so bars recovery. Mingus Constructors, Inc. v. United States, 812 F.2d 1387 (Fed. Cir. 1987). The only portion of the claim for which an identifiable proposal seeking a price increase was submitted is item 4, the sequence control panel (findings 6, 10). In that ins...

Find millions of documents on Course Hero - Study Guides, Lecture Notes, Reference Materials, Practice Exams and more. Course Hero has millions of course specific materials providing students with the best way to expand their education.

Below is a small sample set of documents:

GWU - PDF - 2002
ARMED SERVICES BOARD OF CONTRACT APPEALS Appeal of -Contel Advanced Systems, Inc. Under Contract No. N60530-90-D-0023 APPEARANCES FOR THE APPELLANT: ) ) ) ) )ASBCA No. 49076Thomas F. Williamson, Esq. Susan S. Dunne, Esq. Gayle R. Girod, Esq. Morg
GWU - PDF - 2005
ARMED SERVICES BOARD OF CONTRACT APPEALS Appeal of -Pantech Construction Company, Inc. Under Contract No. DACA31-02-C-0041 APPEARANCES FOR THE APPELLANT: ) ) ) ) )ASBCA No. 54502Roger C. Jones, Esq. Scott C. Hofer, Esq. Huddles & Jones, P.C. Colu
GWU - PDF - 2006
ARMED SERVICES BOARD OF CONTRACT APPEALS Appeal of -United Paradyne Corporation Under Contract No. FA8601-05-C-0006 APPEARANCE FOR THE APPELLANT: ) ) ) ) )ASBCA No. 55374Mr. Joseph J. Hasay President COL Anthony P. Dattilo, USAF Chief Trial Attor
GWU - PDF - 2003
ARMED SERVICES BOARD OF CONTRACT APPEALS Appeal of -Blueridge General, Inc. Under Contract No. DACA65-99-C-0052 APPEARANCE FOR THE APPELLANT: ) ) ) ) )ASBCA No. 53663Jack Rephan, Esq. Rephan Lassiter & Warren PLC Norfolk, VA Thomas H. Gourlay, Jr
Hudson VCC - CS - 103
CS103 Daily Doggie Bag 1The most important topics and details of the day. January 17, 2006Topic 1. Welcome to CS103. Be sure to familiarize yourself with the instructor and TA office hours, and the information available on the WebCT page, including
Hudson VCC - CS - 103
CS103 Daily Doggie Bag 15The most important topics and details of the day. March 30, 2006Topic 1. Language extensions: the ARITH specification. The language BOOL is a very simple language of boolean expressions. As a first extension of BOOL to a mo
Hudson VCC - CS - 202
CS202 Compiler ConstructionApril 24, 2003Compiling Functional LanguagesCompilation of functional languages comprises: Support for unique features, common design patterns Principled techniques for program transformation Provably sound optimizat
Hudson VCC - CS - 202
CS202 Compiler ConstructionFebruary 18, 2003CS 202-151Today:Assignment 5 suggestions Stack frames overviewCS 202-15Topics2Assignment 5: Need to build parse trees for programs Need to build parse trees for typesCS 202-15Assignment
Hudson VCC - CS - 103
CS103 Daily Doggie Bag 20The most important topics and details of the day. May 2, 2006Topic 1. Type checking. By careful inspection of the type judgement derivation rules, it is easy to see that the analysis is decidable. In other words, you can de
Hudson VCC - CS - 202
CS202 Compiler ConstructionFebruary 25, 2003CS 202-151Today:Assignment 6 overview Introduction to IRCS 202-15Topics2Made some tweaks to the spec. since last lecture Nothing major, but: - Variables may now be initialize - volatile eli
Hudson VCC - CS - 209
administriviatodayunit testing group time for second half of classquiz backslightly disappointing mean=84.9 median=88presentations on wednesdaygroup schedules due as wellassignment 3 out on Monday any questions?CS209-14 Unit Testing 1uni
Hudson VCC - CS - 103
CS103 Daily Doggie Bag 23The most important topics and details of the day. December 6, 2005Topic 1. Types for Featherweight Java. We now turn to the typing discpline for Featherweight Java, which is subsumed by Javas type system. Our aim is to form
Hudson VCC - CS - 202
CS202 Compiler ConstructionApril 22, 2003CS 202-371Assignment 12Written problems Relevant topics not thoroughly covered in programming assignmentsWhats the difference between Pond compiler and a real compiler? Advanced topics: language-spec
Hudson VCC - CS - 103
CS103 Daily Doggie Bag 18The most important topics and details of the day. April 5, 2007Topic 1. Distinguishing type errors via failure semantics. So far, we have only made an informal distinction between type errors and divergence within the class
GWU - NSAEBB - 139
GWU - NSAEBB - 64
GWU - NSAEBB - 140
GWU - NSAEBB - 213
GWU - NSAEBB - 40
GWU - NSAEBB - 162
Hudson VCC - CARDIACEP - 2
Medical Physiology 301Cardiac Rhythm AbnormalitiesSinus RhythmsNormal sinus arrhythmia Small, slow variation of the R-R interval i.e. variation of the normal sinus heart rate with respiration, etc.Sinus Tachycardia Defined as sinus rhythm
GWU - NSAEBB - 156
1 717-19 NARA Tape Log The following tape log was prepared by the National Archives and Records Administration: Conversation No. 717-19 Date: May 2, 1972 Time: 12:08-12:42 pm Location: Oval Office The President met with H. R. ("Bob") Haldeman. Presid
GWU - NSAEBB - 98
GWU - NSAEBB - 227
GWU - NSAEBB - 146
GWU - NSAEBB - 162
GWU - NSAEBB - 97
GWU - NSAEBB - 182
GWU - NSAEBB - 73
GWU - NSAEBB - 211
Document No. 21: Message from Ryszard Kukliski on Impending Warsaw Pact InvasionDecember 4, 1980One of the most remarkable stories of the Polish crisis is that of Ryszard Kukliski, a colonel on the Polish General Staff and an extraordinarily valua
GWU - MEET - 2
List of Attachments For Briefing Book Volume 2Attachment 1: IG Report File No. 44-2-326, 44-2-330Attachment 2: Statement of Gordon K. Soper, Principal DeputyAssistant to the Secretary of Defense
GWU - PDF - 2002
ARMED SERVICES BOARD OF CONTRACT APPEALS Appeal of -Phillips National, Inc. Under Contract No. N62467-98-D-1037 APPEARANCES FOR THE APPELLANT: ) ) ) ) )ASBCA No. 53579Dennis E. Jontz, Esq. Ross L. Crown, Esq. Jontz Dawe Gulley & Crown, PC Albuque
GWU - PDF - 2008
ARMED SERVICES BOARD OF CONTRACT APPEALS Appeal of -Public Warehousing Company, K.S.C. Under Contract Nos. SPO300-03-D-3061 SPM300-05-D-3119 SPM300-05-D-3128 APPEARANCES FOR THE APPELLANT: ) ) ) ) ) ) )ASBCA No. 56116Michael R. Charness, Esq. Jam
GWU - PDF - 2000
ARMED SERVICES BOARD OF CONTRACT APPEALS Appeal of -Sach Sinha and Associates, Inc. Under Contract No. N00104-91-C-KB41 APPEARANCE FOR THE APPELLANT: APPEARANCES FOR THE GOVERNMENT: ) ) ) ) )ASBCA No. 50640Mr. Sach Sinha, President Arthur H. Hild
GWU - PDF - 2000
ARMED SERVICES BOARD OF CONTRACT APPEALS Appeal of -Bean Stuyvesant, LLC Under Contract No. DACW64-99-C-0017 APPEARANCE FOR THE APPELLANT: ) ) ) ) )ASBCA No. 52889Peter M. Kilcullen, Esq. Bell, Boyd & Lloyd PLLC Washington, DCAPPEARANCES FOR TH
GWU - PDF - 2003
ARMED SERVICES BOARD OF CONTRACT APPEALS Appeals of -Swiss Reinsurance America Corporation Under Contract No. DACW59-99-C-0002 APPEARANCE FOR THE APPELLANT: ) ) ) ) )ASBCA Nos. 53886, 53887Theodore M. Baum, Esq. Ernstrom & Dreste, LLP Rochester,
Hudson VCC - SYSTEMS - 03
The Sum of Random VariableslThere are three projects that we could invest in. The profit from each project is a function of the state of the economy, as shown in Table. What happens if you invest in each of these projects? In all three?The Sum
Hudson VCC - WEB - 06
UNIVERSITY OF VERMONT DEPARTMENT OF MATHEMATICS AND STATISTICS FORTY-NINTH ANNUAL HIGH SCHOOL PRIZE EXAMINATION MARCH 9, 2006 1) Express 2) Express1 2 1 23 5 4 6 3 5 4 67 8 7 8as a rational number in lowest terms.2 10 2 12 as a rationa
Hudson VCC - CE - 10
Protected Bear Habitat ProposalBy: Francine Clough And Tracy OwenIntroduction Black bear population is in danger of being reduced due to over hunting and human development New Hampshire: 5,000 black bears Vermont: 3,000 black bearsPurpose To
GWU - NSAEBB - 121
GWU - NSAEBB - 124
GWU - NSAEBB - 70
GWU - NSAEBB - 100
GWU - NSAEBB - 67
Hudson VCC - ME - 207
Biomechanics of peripheral nerves and spinal nerve rootsJames IatridisBased on Nordin text, except where indicatedSpinal cord and nerves8 pairs of cervical nerves 12 pairs of thoracic nerves 5 pairs of lumbar nerves 5 pairs of sacral nerves 1 pa
Hudson VCC - PESTCERTEX - 404
INSECTICIDESCHAPTER 13Any chemical used to control a pest Many different kindsBROAD SPECTRUM NARROW SPECTRUM CONTACT/ SYSTEMIC CHITIN (primary structural chemical in body wall) SYNTHESIS INHIBITORS-INTERFERE WITH THE DEVELOPMENT AND MOLTING OF
GWU - EBB - 268
GWU - CS - 181
CSCI 181 : 10 : Computer Animation Design I : Fall 2006 Workflow for creating Blendshapes At it's most basic, what you are doing is creating a duplicate version of your model for each expression. You will create one duplicate that has only the left e
GWU - NSAEBB - 135
Hudson VCC - PSS - 264
Soil MineralogyPrimary minerals-inherited from parent material igneous and metamorphic sand and silt fraction (mostly)Secondary minerals-formed under "normal" temperature and pressure formed in the soil environment or inherited from sedimentary
Hudson VCC - PSS - 264
Ion (Ad)sorptionInteraction between ion and surfaceIon ExchangeReversibleChemisorption (Specific adsorption)Largely irreversiblePrecipitation Absorption (partitioning)Ion ExchangeExtremely rapid "Outer sphere" Reversible Stoichiometric Dep
Hudson VCC - PSS - 264
Critical ReviewMolecular Structure in Soil Humic Substances: The New ViewREBECCA SUTTON* AND GARRISON SPOSITO Department of Environmental Science, Policy and Management, Mulford Hall, Mail Code 3114, University of California, Berkeley, California
Hudson VCC - PSS - 264
Biol Fertil Soils (2000) 30 : 399432Q Springer-Verlag 2000REVIEW ARTICLEH.-R. Schulten 7 P. LeinweberNew insights into organic-mineral particles: composition, properties and models of molecular structureReceived: 19 July 1999Abstract Orga
Hudson VCC - POSTERS - 06
Resolving the Mechanism of Progesterone-induced Downregulation of Insulin-like Growth Factor Binding Protein-5 in Human Breast Cancer CellsCarolina N. Turk Department of Animal Science University of VermontA paper submitted to the URECA! Grant Co
Hudson VCC - POSTERS - 06
ABSTRACT Frequent milking of dairy cows in early lactation has been shown to cause a persistent increase in milk yield throughout the rest of the lactation. The mechanism of this increased milk yield are unknown. I hypothesized that the increase in m
Hudson VCC - POSTERS - 07
Implementing a Swarm Robotics Scheme with Radio and Optical CommunicationsURECA! Recipient: Gregg Carpenter, Electrical Engineering Faculty Mentor: Dr. Jeff Frolik, School of Engineering AbstractOne of the interesting topics being explored in in th
Hudson VCC - POSTERS - 06
Land management effects on dialect formation in the BobolinkAnastasia Yarbrough Rubenstein School of Environment and Natural ResourcesIntroductionA dialect exists when within one population there is little variation in song phrases, but these song
Hudson VCC - POSTERS - 06
Hudson VCC - POSTERS - 06
Energy transport in Drosophila flight: An electron microscopy study of the intracellular distribution of Adenine Nucleotide Translocase*Shawna Guillemette, University of Vermont, Burlington, VT, Sept. 29, 2006* Analysis of null myosin/GFP-sesB tra
GWU - NSAEBB - 94
GWU - NSAEBB - 225