Team Number: 6 Week: 11/14 - 11/20 Program Size (SLOC) Base Actual Added Deleted Modified Reused # of COTS Planned 30 12 30 14 10 10 N/A (current COCOMO estimate = 1896) Code Added is experimentation prorotyping code of AT commands, not direct (Around 15 commands were studied and experimented Total New SLOC Effort (Person-Hours) Project Mgmt. Requirements COTS Assessment Design Life <a...

Register Now

Unformatted Document Excerpt

Coursehero >> California >> USC >> CSCI 577

Course Hero has millions of student submitted documents similar to the one
below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.

Course Hero has millions of student submitted documents similar to the one below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.
Team Number: 6 Week: 11/14 - 11/20 Program Size (SLOC) Base Actual Added Deleted Modified Reused # of COTS Planned 30 12 30 14 10 10 N/A (current COCOMO estimate = 1896) Code Added is experimentation prorotyping code of AT commands, not direct (Around 15 commands were studied and experimented Total New SLOC Effort (Person-Hours) Project Mgmt. Requirements COTS Assessment Design Life <a href="/keyword/cycle-planning-configuration/" >cycle planning configuration</a> Mgmt. Feasibility Analysis Code COTS Tailoring COTS Glue Code <a href="/keyword/development-test-deployment/" >development test deployment</a> Actual 30 14 31 14 10 3 2 code of AT commands, not directly plugged into project) ds were studied and experimented with) Date Wk. 1 2 3 4 5 6 7 8 9 10 11 12 13 Planned 21 31 45 55 66 72 80 84 87 94 Cumulative No. Of <a href="/keyword/tasks-actual-completed/" >tasks actual completed</a> On Sched 12 19 25 40 46 61 61 66 69 80 7 8 16 10 15 10 18 18 16 12 Late 2 4 4 5 5 3 3 2 2 2 Date Wk. 1 2 3 4 5 6 7 8 9 10 11 12 13 Man-hours Planned Actual This Wk. Cumulative This Wk. Cumulative 67 134 121 57 90 102 88 81 74 99 67 201 322 379 469 571 659 740 814 913 71 140 130 45 90 109 88 85 76 101 71 211 341 386 476 585 673 758 834 935 9/21/2005 9/28/2005 10/5/2005 10/12/2005 10/19/2005 10/26/2005 11/2/2005 11/9/2005 11/16/2005 11/23/2005 9/21/2005 9/28/2005 10/5/2005 10/12/2005 10/19/2005 10/26/2005 11/2/2005 11/9/2005 11/16/2005 11/23/2005 Based on submitted effort reports... Progress Description: Describe the progress on the project during the past week, both in qualitative and quantitative. 1. List any significant accomplishments since the last status report (including the completion/revision of project deliverables). a. LCA draft work completed b. Section 4 of SSAD significantly done c. Major changes reflected in each artifact made owing to LCO Package feedback d. e. 2. If you are using COTS Process Framework, list the process areas that you worked in the past week (For example, P3, P4, etc.). a. COTS process framework is not applicable since the project is not COTS intensive. b. c. d. 3. Attach any client meeting notes. If you have not had a client meeting in the past week, say &quot;No client meetings were scheduled&quot;. a. 2 Client meetings were scheduled for the week Weekxx_PR_S02b_Txx.xls b. client office PC architecture was noted c. LCA ARB was scheduled with client d. Weekxx_PR_S02b_Txx.xls Top Project Risks as of 11/23/2005 This Week Last Week 1 2 Risk Description Security of Classified Player Information: Privacy options and session management implemented should be good enough to handle sensitive information Type of SMS web-service COTS to be used has not yet been finalised for the SMS module. A compatible COTS solution may not be available Performance risk regarding sending the messages to 150 players within 2 hours. Stakeholder Success of Football Authorities: As of now, the client says he is the sole customer of the project and USC football authorities need not be involved. However, the budget is to be determined by football administrative authorities but the developers are not being allowed to directly negotiate features versus cost and propose options with football authorities, which poses a risk to project communication and the win conditions of USC football authorities. Incomplete/Evolving GUI definition by client <a href="/keyword/risk-mitigation-action/" >risk mitigation action</a> Items Nature of sensitivity is being analysed and highly sensitive information may be made available only from the client's local disk A hardware approach using a GSM modem is being alternately researched. Information may be bought. Testing network issues of the various service providers and discussing realistic performance with the client. Creation of a passive mode where the client can issue a 'send message' command and need not monitor the system thereafter. Perform Simulation A feasibility study of various COTS SMS option is to be created by the team and the best options will be presented to the football authorities by the client. The client has taken the responsibility of negotiating budget as an internal matter with football authorities and obtaining their acceptance for the required project budget. Weeks Active 8 2 1 10 3 3 10 4 4 9 5 5 Win/win was utilised to complete GUI definition and ID priority. Use evolutionary process model Meet client regularly and have prototypes frequently approved 9 6 6 Old Removed (similar to 4) 7 New developers if involved in the project have to be given Shortfall of key personnel involved in the project (personnel sufficient insight into the project( sufficient background and 8 turnvoer in the project is low.) details of the project) so documentation should be done well in 577a Discussions with the client regarding the budget issues of the project, after presenting the COTS feasibility report. The client Cost of the available COTS in the market may be a risk has taken the responsibility of cost negotiation between Not applicable related to satisfying the client's requirements. himself and the football administration authority a an internal football office matter. Weekxx_PR_S02b_Txx.xls # of Defects Project Mgmt. Requirements COTS Assessment Design Life <a href="/keyword/cycle-planning-configuration/" >cycle planning configuration</a> Mgmt. Feasibility Analysis Code COTS Tailoring COTS Glue Code <a href="/keyword/development-test-deployment/" >development test deployment</a> Total Injected 18 14 Removed 18 14 32 32 32 defects found through ARB feedback Internal Reviews involved general improvement Problem Reports as of 11/23/2005: * See QMP or Below for Definitions <a href="/keyword/type-issues-defects/" >type issues defects</a> Problem Reports Definitions Issues Defects Problem Reports New Opened 0 0 0 New Closed 0 0 0 Current 1 0 0 0 1 2* 1 outstanding old issue closed- LOS tables *2 outstanding old problem reports Old Closed Issues are problems that the &quot;Author&quot; can not fix solely in the artifact or at that specific time Defects in the artifact caused either by a human error (Avoidable Defect) or by situations that the &quot;Author&quot; has no control over ( Unavoidable Defect - e.g. change in the requirement). In case the team is using a <a href="/keyword/defect-tracking/" >defect tracking</a> tool, that is the number of problems reported in the tool. You can also use the Review Forms to collect that information. In that case, this will be the total number of Concerns provided by the reviewers. Concers can be an issue, a defect or neither (consider that reviewers might indicate false defects). Problem Description: List any problems team is experiencing. This includes things that have caused delays, rework or any other roadblocks to anticipated progress. No. Problem Description Proposed Solutions Is it COTS Related? (Y/N) 1 Better time management Dry runs will be increased next N required in ARB presentations time 2 IVVs...

Find millions of documents on Course Hero - Study Guides, Lecture Notes, Reference Materials, Practice Exams and more. Course Hero has millions of course specific materials providing students with the best way to expand their education.

Below is a small sample set of documents:

USC - CSCI - 577
Team Number: 6 Week: 04/03-04-10 Program Size (SLOC) Base Added Deleted Modified Reused # of COTS Total New SLOC Effort (Hours) Project Mgmt. Requirements COTS Assessment Design Life Cycle Planning Environment Preparation Configuration Mgmt. Feasibil
USC - CSCI - 577
Team Number: 6 Week: 11/21 - 11/28 Program Size (SLOC) Base Actual Added Deleted Modified Reused # of COTS Planned 30 35 10 32 10 10 711N/A (current COCOMO estimate = 1896) (current code is prototyping code and AT commands for SMS)Total New SLO
USC - CSCI - 577
Team Number: 6 Week: 11/28 - 12/5 Program Size (SLOC) Base Actual Added Deleted Modified Reused # of COTS Planned 45 25 2 45 8 1112N/A (current COCOMO estimate = 1896) (current code is prototyping code and AT commands for SMS)Total New SLOCEf
USC - CSCI - 577
Team Number: 6 Week: 04/17-04-26 Program Size (SLOC) Base Added Deleted Modified Reused # of COTS Total New SLOC Effort (Hours) Project Mgmt. Requirements COTS Assessment Design Life Cycle Planning Environment Preparation Configuration Mgmt. Feasibil
Bradley - CEGT - 201
Chemistry 161 General Chemistry - 4 Hours Required Course Description Fundamental chemical principles and applications; descriptive properties of more useful elements. Content of Chemistry 160 with lab. Prerequisites Satisfactory credits in high scho
USC - CSCI - 577
Team 6Easy Win-Win Negotiation Session I.Date: Monday, 19th Sept, 2005 Time: 11.30am 1.50pm Place: Computer Lab: SAL, room- 322 The Client: *Jared Blank USC Football The Team: *Revati Kadu (Project Manager) *Akshay Aras (Project Coordinator) *Ab
USC - CSCI - 577
Easy Win-Win Negotiation Session II.Date: Thursday, 22nd Sept, 2005 Time: 2.00pm 4.00pm Place: Computer Lab: SAL, room- 322 The Client: *Jared Blank USC Football The Team: *Revati Kadu (Project Manager) *Akshay Aras (Project Coordinator) *Abhishek
USC - CSCI - 577
Date: Wednesday, 19th October, 2005 Time: 10.15pm 12.00pm Place: SAL 322, USC The Client: *Jared Blank USC Football The Team: *Revati Kadu (Project Manager) *Akshay Aras (Project Coordinator) *Abhishek Venkatesh *Vivek Ganapathy Nagarajan *Amruta C
USC - CSCI - 577
Date: Wednesday, 16th Nov, 2005 Time: 3.30pm 4.30pm Place: Howard Jones Ground, USC. The Client: *Jared Blank USC Football The Team: Revati Kadu (Project Manager) *Akshay Aras (Project Coordinator) *Abhishek Venkatesh *Vivek Ganapathy Nagarajan *Am
USC - CSCI - 577
Date: Monday, 6th February, 2006 Time: 3.30pm 4.15pm Place: Heritage Hall, USC The Client: *Jared Blank USC Football The Team: *Revati Kadu (Project Manager) *Akshay Aras (Project Coordinator) *Abhishek Venkatesh *Amruta Chitnis *Natasha Karnik Mik
USC - CSCI - 577
Date: Monday, 10th April, 2006 Time: 3.30pm 4.50pm Place: Heritage Hall, USC The Client: *Jared Blank USC Football The Team: *Revati Kadu (Project Manager) *Akshay Aras (Project Coordinator) *Abhishek Venkatesh *Amruta Chitnis *Natasha Karnik Mike
USC - CSCI - 577
43166a6d373083b1fe767005bc1ada085362ec69.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:USC Football Recruiting DatabaseOCD ElaborationReview # Review Date: Review Time:1 2/17/2006 12:0
USC - CSCI - 577
65c0ff3a3fa08c8ebad6be326d3c6d3fcd9236f6.xls - Areas of Concern LogProjectName: Artifact: Module: MBASEPhase/level: Activity: ExitCriteria: Reviewer: ReviewLeaderemail: ReviewLeaderphone: Author:USC Football Recruiting DatabaseRLCA_OCDReview#
USC - CSCI - 577
418c6b1e939bc78e9638f5520ec0cdf48a2514f5.xls - Areas of Concern LogProjectName: Artifact: Module: MBASEPhase/level: Activity: ExitCriteria: Reviewer: ReviewLeaderemail: ReviewLeaderphone: Author:USC Football Recruiting DatabaseIP_IOC_S06b_T06_v1
USC - CSCI - 577
99231dd236ade2911a544c07dcb5a2de9297e725.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: USC Football Recruiting DatabaseIP_IOC_S06
USC - CSCI - 577
9812dc07568e7390fb7c209aa68580706880f338.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: USC Football Recruiting DatabaseRLCA_OCD
USC - CSCI - 577
5a856243d71d5cfedc236eb0559580b522198658.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: USC Football Recruiting DatabaseLean_VBR_C
USC - CSCI - 577
89b6489c47e4124d95ea8e18598f6fe38a952fef.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: USC Football Recruiting DatabaseIP_IOC_S06
USC - CSCI - 577
ade1dc4f46b2c6a229a5eae4bd9f445bd705c175.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level:USC Football Recruiting DatabaseOCD 2.1 ElaborationReview # Review Date: Review Time:Activity: Artifact Review RLCA Exit
USC - CSCI - 577
6b597e57217fdb33eafa0c6e07097cea370e7195.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level:USC Football Recruiting DatabaseOCD 2.2 ConstructionReview # Review Date: Review Time:Activity: Artifact Review RLCA Pack
USC - CSCI - 577
33341cabb6d5b0bc9e37701597baffb17fb790fc.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level:USC Football Recruiting DatabaseIP 1.2 ConstructionReview # Review Date: Review Time:Activity: Artifact Review IOC Packag
USC - CSCI - 577
785586948f741cd77814c9452ab8b42d5603f44b.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level:USC Football Recruiting Database*.apsz and *.aspx.cs Files ConstructionReview # Review Date: Review Time:Activity: Artifac
USC - CSCI - 577
William Dong wcd@usc.edu USC ID# 6178019587 CSCI577a Team 6 Early OCD Review A. Management Overview 3.1.1 Relation to Current System - Describes what the current system is lacking and how the new system will benefit the customer. 3.2.3 Level of Serv
USC - CSCI - 577
William Dong wcd@usc.edu F05-109 USC ID# 6178019587 CSCI577a Team 6 LCO Draft Review A. Management Overview OCD Version 1.3 The newly added section 3.4.1 Organizational Transformations does a good job of explaining from a high level how not much wil
USC - CSCI - 577
Operatiational Concept Description (OCD)VERSION 1.8USC Football Recruiting Database(Team 6)ClientJared Blank USC FootballThe TeamFeasibility Rationale Systems Architecture &amp; Modeling System Operational Concept System Analysis and Prototype
USC - CSCI - 577
Operatiational Concept Description (OCD)VERSION 1.8USC Football Recruiting Database(Team 6)ClientJared Blank USC FootballThe TeamFeasibility Rationale Systems Architecture &amp; Modeling System Operational Concept System Analysis and Prototype
USC - CSCI - 577
System and Software Requirements Definition (SSRD)Version 1.6USC Football Recruiting Database(Team No 6)ClientJared Blank USC FootballThe TeamFeasibility Rationale Systems Architecture &amp; Modeling System Operational Concept System Analysis
USC - CSCI - 577
System and Software Requirements Definition (SSRD)Version 1.6USC Football Recruiting Database(Team No 6)ClientJared Blank USC FootballThe TeamFeasibility Rationale Systems Architecture &amp; Modeling System Operational Concept System Analysis
USC - CSCI - 577
System and Software Architecture Description (SSAD)Version 1.6USC Football Recruitment Database(Team 6)ClientJared Blank USC FootballThe TeamFeasibility Rationale Systems Architecture &amp; Modeling System Operational Concept Systems Analysis
USC - CSCI - 577
Feasibility Rational Description (FRD)Version 1.5Feasibility Rationale Description (FRD)Version 1.5USC Football Recruitment Database(Team 6)ClientJared Blank USC FootballThe TeamFeasibility Rationale Systems Architecture &amp; Modeling Sys
USC - CSCI - 577
Life Cycle Plan (LCP)Version 1.5USC Football Recruitment Database(Team 6) ClientJared Blank USC FootballFeasibility Rationale Systems Architecture &amp; Modeling System Operational Concept System Analysis and Prototypes UML Modeling Life cycle P