SSRD_Draft_DC_ExitCriteria_IIVVa_F08a_T07_V1.3
50 Pages

SSRD_Draft_DC_ExitCriteria_IIVVa_F08a_T07_V1.3

Course Number: CSCI 577, Fall 2009

College/University: USC

Word Count: 214

Rating:

Document Preview

Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- System and Software Requirements (SSRD) 1. An introduction containing: a. The purpose of the SSRD b. Status of the SSRD 2. Product requirements in tabular format containing for the following: a. Capability requirements containing: the requirement name, description, priority, input(s), source(s), output(s), destination(s), precondition(s), post condition(s), and...

Unformatted Document Excerpt
Coursehero >> California >> USC >> CSCI 577

Course Hero has millions of student submitted documents similar to the one
below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.

Course Hero has millions of student submitted documents similar to the one below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.

Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- System and Software Requirements (SSRD) 1. An introduction containing: a. The purpose of the SSRD b. Status of the SSRD 2. Product requirements in tabular format containing for the following: a. Capability requirements containing: the requirement name, description, priority, input(s), source(s), output(s), destination(s), precondition(s), post condition(s), and win-win agreement(s) b. Level of service requirements containing the requirement name, description, priority, desired level, accepted level, measurable, achievable, relevant, specific, and win-win agreement(s) 3. Interface requirements in tabular format for the following containing the requirement name, requirement description, priority, and win-win agreement: a. <a href="/keyword/user-interface-standards-requirements/" >user interface standards requirements</a> b. Hardware interface requirements (if applicable) c. Computer software requirements (if applicable) d. Computer communication requirements (if applicable) e. Deployment requirements (if applicable) f. Transition requirements (if applicable) g. Support environment requirements (if applicable) h. Budget and schedule requirements (if applicable) 4. Evolutionary requirements containing a. Capability requirements that cover the requirement name, description, priority, input source(s), output destination(s), preconditi...

Find millions of documents on Course Hero - Study Guides, Lecture Notes, Reference Materials, Practice Exams and more. Course Hero has millions of course specific materials providing students with the best way to expand their education.

Below is a small sample set of documents:

USC - CSCI - 577
ecf66a541dbfbee06c3dfd428251257dbd22ad5f.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: EZBaySSRD v1.3 N/A FoundationsReview # R
USC - CSCI - 577
SSRD_Draft_DC_AIR_IIVVb_F08a_T07_V1.3.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author:EZBaySSRD v1.3 N/A FoundationsReview # Revie
USC - CSCI - 577
Reviewed Document: FED_F08a_T07_V1.4.doc Reviewer: Kevin Stigerts, Team 7 IIV&amp;V Date Reviewed: November 30, 2008 Exit Criteria 1. All sections completed for FC Package a. Evidence of feasibility of development process as identified in Section A3.2 b.
USC - CSCI - 577
Reviewed Document: FED_F08a_T07_V1.4.doc Reviewer: Kevin Stigerts, Team 7 IIV&amp;V Date Reviewed: November 30, 2008 Exit Criteria 1. All sections completed for FC Package a. Evidence of feasibility of development process as identified in Section A3.2 b.
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria Feasibility Evidence Description (FED)1. An introduction covering the following: a. Purpose of the FED b. Status of the current iteration of the FED 2. A business case analysis including: a. Cost a
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Feasibility Evidence Description (FED)1. An introduction covering the following: a. Purpose of the FED b. Status of the current iteration of the FED 2. A business case analysis including: a. Cost
USC - CSCI - 577
Sheet1&lt;?xml version=&quot;1.0&quot; encoding=&quot;UTF-8&quot;?&gt; &lt;Error&gt;&lt;Code&gt;NoSuchKey&lt;/Code&gt;&lt;Message&gt;The specified key does not exist.&lt;/Message&gt;&lt;Key&gt;92f0ed44ec70bd88c2f26bPage 1
USC - CSCI - 577
c6e2b1e59812a754c52a229b0ae72b122e7d2816.xls - Areas of Concern LogProjectName: Artifact: Module: MBASEPhase/level: Activity: ExitCriteria: Reviewer: ReviewLeaderemail: ReviewLeaderphone: Author:EzbayFeasabilityEvidenceDescription(FED) Foundatio
UC Riverside - JAN - 308
AllSite_AllDay SO4 NO3 NH4d OC EC TCM SOIL CM PM25 RCFM PM10 Fraction
USC - CSCI - 577
FED_Draft_DC_AIR_IIVVa_F08a_T07_V1.4 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbayFeasability Evidence Description (FED) FoundationsReview # Review Date: Review Time:11/27/2008 7:05 PM
UC Riverside - FEB - 308
AllSite_AllDay SO4 NO3 NH4d OC EC TCM SOIL CM PM25 RCFM PM10 Fraction
UC Riverside - NOV - 308
AllSite_AllDay SO4 NO3 NH4d OC EC TCM SOIL CM PM25 RCFM PM10 Fraction
USC - CSCI - 577
Reviewed Document: ATPC_F08a_T07_V1.0.doc Reviewer: Kevin Stigerts, Team 7 IIV&amp;V Date Reviewed: November 30, 2008 Exit Criteria 1. At least one test case prepared and included in the document 2. Test plan outline
USC - CSCI - 577
Reviewed Document: ATPC_F08a_T07_V1.0.doc Reviewer: Kevin Stigerts, Team 7 IIV&amp;V Date Reviewed: November 30, 2008 Exit Criteria 1. At least one test case prepared and included in the document 2. Test plan outline
USC - CSCI - 577
GabrielAlcocer CSCI577a,Fall2008 ExitCriteriaAcceptanceTestPlanandCases(ATPC) 1. Introductionwith: a. Purposeofthetestplan b. References 2. Teststrategyandpreparationbrokendowninto: a. Hardwarepreparation b. Softwarepreparation c. Requirementstraceab
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Acceptance Test Plan and Cases (ATPC) 1. Introduction with: a. Purpose of the test plan b. References 2. Test strategy and preparation broken down into: a. Hardware preparation b. Software preparati
USC - CSCI - 577
Reviewed Document: ATPC_F08a_T07_V1.0.doc Reviewer: Kevin Stigerts, Team 7 IIV&amp;V Date Reviewed: November 30, 2008 Supplemental Review Report A) Management Overview a. Provides outline for test plan B) Technical Details a. Provides one test case (othe
USC - CSCI - 577
Reviewed Document: ATPC_F08a_T07_V1.0.doc Reviewer: Kevin Stigerts, Team 7 IIV&amp;V Date Reviewed: November 30, 2008 Supplemental Review Report A) Management Overview a. Provides outline for test plan B) Technical Details a. Provides one test case (othe
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Evaluation Report Acceptance Test Plan and Cases (ATPC)Management Overview The test solution the document outlines for each requirement is easy for a nontechnical reader to understand because of the way the inf
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Evaluation Report- Acceptance Test Plan and Cases (ATPC)Management Overview- The test solution the document outlines for each requirement is easy for a nontechnical reader to understand because of the way the in
USC - CSCI - 577
Reviewed Document: QMP_F08a_T07_V1.1.doc Reviewer: Kevin Stigerts, Team 7 IIV&amp;V Date Reviewed: November 30, 2008 Exit Criteria 1. Completed to FC Package criteria: a. Identify the approach on Configuration and change policy b. Define the strategy in
USC - CSCI - 577
Reviewed Document: QMP_F08a_T07_V1.1.doc Reviewer: Kevin Stigerts, Team 7 IIV&amp;V Date Reviewed: November 30, 2008 Exit Criteria 1. Completed to FC Package criteria: a. Identify the approach on Configuration and change policy b. Define the strategy in
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Quality Management Plan (QMP) 1. An introductory section that includes: a. The purpose of the QMP b. The status of the QMP 2. A description of the Quality Management Strategy that entails: a. Defect
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Quality Management Plan (QMP) 1. An introductory section that includes: a. The purpose of the QMP b. The status of the QMP 2. A description of the Quality Management Strategy that entails: a. Defect
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria Unified Modeling Language (UML)1. Refined System Analysis Model, if necessary 2. Refined design model 3. At least a technologyspecific model which includes: a. Hardware components b. Software compo
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Unified Modeling Language (UML)1. Refined System Analysis Model, if necessary 2. Refined design model 3. At least a technology-specific model which includes: a. Hardware components b. Software com
USC - CSCI - 577
UML_Draft_DC_AIR_IIVVa_F08a_T07_V2.0 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbayQuality Management Plan (QMP) FoundationsReview # Review Date: Review Time:12/13/2008 9:00 PMDate Se
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Transition Plan (TP) 1. A section that discusses the transition strategy including: a. Transition objections b. Transition process strategy 2. A description outlining the preparation work for the tr
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Transition Plan (TP) 1. A section that discusses the transition strategy including: a. Transition objections b. Transition process strategy 2. A description outlining the preparation work for the tr
USC - CSCI - 577
d04a37142858eb906bd7ade3a7e6a22b5f3f4738.xls - Areas of Concern LogProjectName: Artifact: Module: MBASEPhase/level: Activity: ExitCriteria: Reviewer: ReviewLeaderemail: ReviewLeaderphone: Author:EzbayTransitionPlan(TP) FoundationsReview# Revie
USC - CSCI - 577
TP_DCPackage_AIR_IIVVa_F08a_T07_V1.1 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbayTransition Plan (TP) FoundationsReview # Review Date: Review Time:12/13/2008 8:55 PMDate Sent to Rev
USC - CSCI - 577
c8e4266fe0e1f9cd3a7120a34c2b72674aac883e.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: EzbaySystem Software Architecture Descript
USC - CSCI - 577
SSAD_DCPackage_AIR_IIVVa_F08a_T07_V2.0 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbaySystem Software Architecture Description (SSAD) FoundationsReview # Review Date: Review Time:12/13/2
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria Supporting Information Document (SID)1. An introduction section containing: a. The purpose of the SID document b. Status of the package c. References to resources used during the creation of this d
USC - CSCI - 577
e4bf615929eb5f4d07e5ee05a138cee22a7f4858.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: EzbaySupporting Information Document (SID)
USC - CSCI - 577
SID_DCPackage_AIR_IIVVa_F08a_T07_V1.4 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbaySupporting Information Document (SID) FoundationsReview # Review Date: Review Time:12/13/2008 7:40 PM
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria Operational Concept Description (OCD)1. Introduction section with: a. Purpose of the OCD b. Status of the OCD 2. Shared Vision with: a. A listing of SuccessCritical Stakeholders in tabular form b.
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Operational Concept Description (OCD)1. Introduction section with: a. Purpose of the OCD b. Status of the OCD 2. Shared Vision with: a. A listing of Success-Critical Stakeholders in tabular form b
USC - CSCI - 577
24f0e31d6a3549f045bc83d4000e3fe20d89f22f.xls - Areas of Concern LogProjectName: Artifact: Module: MBASEPhase/level: Activity: ExitCriteria: Reviewer: ReviewLeaderemail: ReviewLeaderphone: Author:EzbayOperationalConceptDescription(OCD) Foundation
USC - CSCI - 577
OCD_DCPackage_AIR_IIVVa_F08a_T07_V1.6 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbayOperational Concept Description (OCD) FoundationsReview # Review Date: Review Time:12/13/2008 6:20 PM
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Life Cycle Plan (LCP)1. Introduction containing the following: a. Purpose of the LCP b. Status of the current iteration of the LCP c. Assumptions made going forward 2. A listing of milestones and
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Life Cycle Plan (LCP)1. Introduction containing the following: a. Purpose of the LCP b. Status of the current iteration of the LCP c. Assumptions made going forward 2. A listing of milestones and
USC - CSCI - 577
a4358a27485a70847fe926fee333eda82ae310b0.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: EzbayLife Cycle Plan (LCP) FoundationsRe
USC - CSCI - 577
LCP_DCPackage_AIR_IIVVa_F08a_T07_V1.6 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbayLife Cycle Plan (LCP) FoundationsReview # Review Date: Review Time:12/13/2008 5:40 PMDate Sent to R
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria System and Software Requirements (SSRD)1. An introduction containing: a. The purpose of the SSRD b. Status of the SSRD 2. Product requirements in tabular format containing for the following: a. Cap
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- System and Software Requirements (SSRD)1. An introduction containing: a. The purpose of the SSRD b. Status of the SSRD 2. Product requirements in tabular format containing for the following: a. Ca
USC - CSCI - 577
255a8079c605d881bc5565a8897966173a4581d5.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: EzbaySystem and Software Requirements Defi
USC - CSCI - 577
SSRD_DCPackage_AIR_IIVVa_F08a_T07_V1.5 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbaySystem and Software Requirements Definition (SSRD) FoundationsReview # Review Date: Review Time:12/1
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria Feasibility Evidence Description (FED)1. An introduction covering the following: a. Purpose of the FED b. Status of the current iteration of the FED 2. A business case analysis including: a. Cost a
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Feasibility Evidence Description (FED)1. An introduction covering the following: a. Purpose of the FED b. Status of the current iteration of the FED 2. A business case analysis including: a. Cost
USC - CSCI - 577
924c029411b8fbdd3363dc41f592f48e4b8e625e.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: EzbayFeasability Evidence Description (FED
USC - CSCI - 577
FED_DCPackage_AIR_IIVVa_F08a_T07_V1.6 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbayFeasability Evidence Description (FED) FoundationsReview # Review Date: Review Time:12/13/2008 4:45 P
USC - CSCI - 577
GabrielAlcocer CSCI577a,Fall2008 ExitCriteriaAcceptanceTestPlanandCases(ATPC) 1. Introductionwith: a. Purposeofthetestplan b. References 2. Teststrategyandpreparationbrokendowninto: a. Hardwarepreparation b. Softwarepreparation c. Requirementstraceab
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Acceptance Test Plan and Cases (ATPC) 1. Introduction with: a. Purpose of the test plan b. References 2. Test strategy and preparation broken down into: a. Hardware preparation b. Software preparati
USC - CSCI - 577
5e84d2849813ca1e87978291d842274a5529c87d.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: EzbayAcceptance Test Plan and Cases (ATPC)
USC - CSCI - 577
ATPC_DCPackage_AIR_IIVVa_F08a_T07_V1.0 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbayAcceptance Test Plan and Cases (ATPC) FoundationsReview # Review Date: Review Time:12/13/2008 4:45 P
USC - CSCI - 577
Gabriel Alcocer CSCI 577a, Fall 2008 Exit Criteria- Quality Management Plan (QMP) 1. An introductory section that includes: a. The purpose of the QMP b. The status of the QMP 2. A description of the Quality Management Strategy that entails: a. Defect
USC - CSCI - 577
QMP_DCPackage_AIR_IIVVa_F08a_T07_V1.2 - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria:EzbayQuality Management Plan (QMP) FoundationsReview # Review Date: Review Time:12/13/2008 7:30 PMDate S
Drexel - MATH - 201
MATH 201 Linear AlgebraFall 2007-08Instructor: Contact information: Oce hours: Course webpage: Lectures:Dr. Georgi Medvedev Korman 292, medvedev@drexel.edu, (215) 895-6612 Tuesday 1-1:50 www.math.drexel.edu/ medvedev/classes/2007/math201/ 201-
UC Riverside - OCT - 308
Comparison of PM ModelsRalph Morris ENVIRON International Corporation Novato, CA(rmorris@environcorp.com)WRAP Modeling Forum Meeting Riverside, California October 8-9, 2003Presents:/slides/greg/camx4_pmcamx_3-25-03.pptScience in PM Models Gas/
Drexel - MATH - 210
MATH 210 Dierential EquationsDr. Georgi Medvedev 265 Korman 6612, email: medvedev@drexel.eduFall 2005-06Instructor: Oce: Telephone: Lectures: Oce hours: Course webpage:TR 2-4 TBA or by appointment www.math.drexel.edu/ medvedev/classes/math210