8 Pages

Exam3_09

Course: CHEM 434, Fall 2009
School: NMSU
Rating:
 
 
 
 
 

Word Count: 825

Document Preview

Chem434 Exam 5/6/09, # 3 or Student ID _______________________ Last Name _______________________ 1. ___________ (5 pts) 2. ___________ (8 pts) 3. ___________ (8 pts) 4. ___________ (17 pts) 5. ___________ (12 pts) 6. ___________ (4 pts) 7. ___________ (12 pts) 8. ___________ (12 pts) 9. ___________ (12 pts) 10. ___________ (7 pts) Extra ___________ Total:__________ (100pts) This exam consists of two parts: The...

Register Now

Unformatted Document Excerpt

Coursehero >> New Mexico >> NMSU >> CHEM 434

Course Hero has millions of student submitted documents similar to the one
below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.

Course Hero has millions of student submitted documents similar to the one below including study guides, practice problems, reference materials, practice exams, textbook help and tutor support.
Chem434 Exam 5/6/09, # 3 or Student ID _______________________ Last Name _______________________ 1. ___________ (5 pts) 2. ___________ (8 pts) 3. ___________ (8 pts) 4. ___________ (17 pts) 5. ___________ (12 pts) 6. ___________ (4 pts) 7. ___________ (12 pts) 8. ___________ (12 pts) 9. ___________ (12 pts) 10. ___________ (7 pts) Extra ___________ Total:__________ (100pts) This exam consists of two parts: The first part is close book close notes with mostly conceptual problems. Give a brief explanation for maximum credit. You c...
Find millions of documents on Course Hero - Study Guides, Lecture Notes, Reference Materials, Practice Exams and more. Course Hero has millions of course specific materials providing students with the best way to expand their education.

Below is a small sample set of documents:

USC - CSCI - 577
Explanation Log AAR Summary of LCO Draft Team 5 10/29/2007 CSCI 577a, Fall 2007Location LCP section 1.2 ConcernAssumptionscanadddetails abouttheexpectedhardware fortheapplication PREXmightbe"LOW"or"V LOW"insteadofnominalsince noonehasdirectexperien
USC - CSCI - 577
Explanation Log AAR Summary of LCO Draft Team 5 10/29/2007 CSCI 577a, Fall 2007Location LCP section 1.2 ConcernAssumptions can add details about the expected hardware for the application PREX might be "LOW" or "V LOW" instead of nominal since no on
UCSC - CMPS - 160
USC - CSCI - 577
a3ee57c24ce0355d2af55fb017e9bdc2b845d36e.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardProtype : SSAD_LCO
UCSC - CMPS - 160
USC - CSCI - 577
Explanation Log AAR Summary of LCO Draft Team 5 10/31/2007 CSCI 577a, Fall 2007Location Figure 2 ConcernIsitpossibletorepresentthe factthatadashboardismade ofxcontrolsandeachcontrol iseitheradialoradisplayasis doneinfig3 Considerhavingpersistencein
USC - CSCI - 577
Explanation Log AAR Summary of LCO Draft Team 5 10/31/2007 CSCI 577a, Fall 2007Location Figure 2 ConcernIs it possible to represent the fact that a dashboard is made of x controls and each control is either a dial or a display as is done in fig 3 C
USC - CSCI - 577
Quality Management Plan (QMP) Crystal Stairs Dashboard Team 5Sai Nallapaneni (Project Manager) Manish Khanna (System Architect) Abhijit Mathur (Quality Assurance) Jaskiran Sodhi (Requirements Engineer) Prithvish Tella (Analyst) Sirisha Movva (Progr
USC - CSCI - 577
Quality Management Plan (QMP) Crystal Stairs Dashboard Team 5Sai Nallapaneni (Project Manager) Manish Khanna (System Architect) Abhijit Mathur (Quality Assurance) Jaskiran Sodhi (Requirements Engineer) Prithvish Tella (Analyst) Sirisha Movva (Progr
USC - CSCI - 577
17f15d780ed46509e9f28a701618f42a3faea79b.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardSID V1.5 Inception
USC - CSCI - 577
bf8459552f097e3ab9aebb484e3936057d8d7f20.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardOCD V1.3 Inception
USC - CSCI - 577
ad2f144dd57f3aa0aebdedd78112810f904eab1a.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardSSRD v 1.4 Incepti
USC - CSCI - 577
fe1f2848504ea2ced38b57fb577325daf379f688.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardLCP V1.2 Inception
USC - CSCI - 577
436efe9ff1d447308c8c73f7538c8d3d005816ed.xls - Areas of Concern LogProjectName: Artifact: Module: MBASEPhase/level: Activity: ExitCriteria: Reviewer: ReviewLeaderemail: ReviewLeaderphone: Author:Crystal Stairs DashboardFRDV1.2 InceptionReview#
USC - CSCI - 577
e30c42c2cec002e26ef4804530aea97bb9d0268d.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardSSAD V1.2 Inceptio
USC - CSCI - 577
61487763f182e46bfcc76c8736e219a61f3fbcf8.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardRSM v1.1 Inception
USC - CSCI - 577
LCO Package EvaluationTeam 5 Crystal Stairs DashboardAuthor: Martha Saenz Date: Nov 5, 2007 OCD SSRD SSAD LCP FRD SID RSM Documents Reviewed Operational Concept Description System and Software Requirements Definition System and Software Architectur
USC - CSCI - 577
05ee862d0894d906a6b276e4bd92ece4c9230b24.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardSID V1.5 Inception
USC - CSCI - 577
2e0aeeea4682306b1e0d0f922c1abd5faf39a84d.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardOCD V1.3 Inception
USC - CSCI - 577
ec8f0ceddd3195bc270020732dd62d2519c6bf74.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardSSRD v 1.4 Incepti
USC - CSCI - 577
0f1eb9418b5c1c8c3c8c8be416d6340e5677fe5d.xls - Areas of Concern LogProjectName: Artifact: Module: MBASEPhase/level: Activity: ExitCriteria: Reviewer: ReviewLeaderemail: ReviewLeaderphone: Author:Crystal Stairs DashboardLCPV1.2 InceptionPhaseRe
Wichita State - RE - 611
Nickname for grades_Name _Real Estate FinanceSpring 2009 Midterm Exam 2 Version A Dr. Stanley D. Longhofer MW 9:30-10:45 DO NOT OPEN THIS EXAM UNTIL I GIVE YOU PERMISSION TO BEGIN! Midterm exam rules: 1. You may use one, 8 x 11 inch pages of n
USC - CSCI - 577
1dd843e7ec7091eb48ae0f84042758c480cbd6ef.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardSSAD V1.2 Inceptio
USC - CSCI - 577
6f8eb0b0001c0ae14db1ce271851642837bf9d76.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardRSM v1.1 Inception
USC - CSCI - 577
Explanation Log AAR Summary of LCO Package Team 5 11/12/2007 CSCI 577a, Fall 2007Location LCP section 1.3 LCP Page 20 LCP section 5 ConcernShould OCD be referenced Missing COTS product explanationExplanationNot required or critical for the docu
USC - CSCI - 577
Quality Management Plan (QMP) IICrystal Stairs Dashboard Team 5Sai Nallapaneni (Project Manager) Manish Khanna (System Architect) Abhijit Mathur (Quality Assurance) Jaskiran Sodhi (Requirements Engineer) Prithvish Tella (Analyst) Sirisha Movva (Pr
USC - CSCI - 577
Quality Management Plan (QMP) IICrystal Stairs Dashboard Team 5Sai Nallapaneni (Project Manager) Manish Khanna (System Architect) Abhijit Mathur (Quality Assurance) Jaskiran Sodhi (Requirements Engineer) Prithvish Tella (Analyst) Sirisha Movva (Pr
USC - CSCI - 577
249b3c7f36c5a539326e4c3fd5b5e1638ab92359.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardSID V2 ELABORATION
USC - CSCI - 577
caec6c529041b74956de8604bca3696f900676f3.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardSSRD v 2 Elaborati
USC - CSCI - 577
4b5452f051a175ca7692878e284b8efa3bb948a6.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardLCP V2.0 Elaborati
USC - CSCI - 577
813bc75868212062dfb1eaa74882d6d4f6b5e782.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardFRD V2.0 Inception
USC - CSCI - 577
405b0d84d8717603b2a90c6c67256d2b3303d561.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Elaboration Activity: Agile Artifact Review Exit Criteria: All concerns addressed Reviewer: Review Leader email: Review Leader pho
USC - CSCI - 577
d3e0bcd6983cbc6850a81e259d6ab378e19105fd.xls - Areas of Concern LogProjectName: Crystal Stairs Dashbaord Artifact: TestPlanCaseV1.0 Module: MBASEPhase/level: Elaboration Activity: AgileArtifactReview ExitCriteria: Allconcernsaddressed Reviewer: Revi
USC - CSCI - 577
Crystals Stairs DashboardTeam 5 Author: Martha Saenz IV&V A. Management Overview: The team did a good job at addressing feedback from client, IIVV and ARB board.B. Technical Details: One important requirement was captured (Evolutionary requireme
University of Illinois, Urbana Champaign - BUSINESS - 458
Lesson6:Control StatementsContinuedObjectives: ConstructcomplexBooleanexpressionsusing thelogicaloperators&(AND),|(OR),and! (NOT). Understandthelogicofnestedifstatements andextendedifstatements. Constructnestedloops. Constructtruthtablesfo
UCF - CWR - 6102
USC - CSCI - 577
b4acbb828ae18bb8636adf3baad359208c3f3aca.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardOCD V2 Elaboration
UCF - CWR - 6102
VIII Modeling Uncertainty1 2 3 4 5 6INTRODUCTION . 1 GENERATING VALUES FROM KNOWN PROBABILITY DISTRIBUTIONS .. 1 MONTE CARLO SIMULATION . 4 CHANCE CONSTRAINED MODELS . 7 MARKOV PROCESSES AND TRANSITION PROBABILITIES . 9STOCHASTIC OPTIMIZATION .
UCF - CWR - 6102
Marty Wanielista, Josh Spence, and Ewoud Hulstein VOLUME CONTROL using InterEvent Dry Periods byStormwater Management Academy UNIVERSITY OF CENTRAL FLORIDAOutline Why? Basic Principles Specifications and Regulations Watershed Abstractions
UCF - CWR - 6102
USC - CSCI - 577
Respond_Evaluation_LCADraft_OCD_F07a_T05.xls - Problem List CoverProject Name: Artifact: Module:Crystal Stairs Dashboard OCD V2Review #: 1 Date: Activity: MBASE Phase/level:12/10/2007 Response0Type of review: Independent Review No. of Pri
Caltech - EE - 185
EE185: MEMS/NEMS Technology and Devices (3-0-6)Prof. Y.C. Tai Office: Moore 11 Email: yctai@mems.caltech.eduOverview of the Course: This is a senior/1st-year graduate course on fundamental MEMS technology and devices (including silicon techniques)
USC - CSCI - 577
93fc9d00477b6812f128132ce0d803313794ac36.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardLCP V2.0 Elaborati
Caltech - EE - 185
A Brief MEMS HistorySi as a mechanical material (Petersen) BJT Transistor Pressure Sensor Si Pressure (Honeywell) Sensor IC (Motorola) Anodic BondingHNA EDP KOHThermo-pneumatic valve (Redwood) SFB Pressure Sensor (NovaSensor)DRIE ! SFB TMAH XeF2
Caltech - EE - 185
Case Study
Caltech - EE - 185
Caltech - EE - 185
Dry Etching OverviewWhat is dry etching?Dry EtchingProf. Tianhong Cui, Mechanical Engineering ME 8254 Material removal reactions occur in the gas phase.Types of dry etching Non-plasma based dry etching Plasma based dry etchingWhy dry etch
Caltech - EE - 185
Caltech - EE - 185
Lecture 2. Polymer Micromachining Hot embossing, injection molding PDMS replica molding Soft Lithography SU-8 Microstructures Polyimide MEMS Parylene MEMS StereolithographyParylene microcolumnRapid prototyped mini-carHot Embossing, Inje
Caltech - EE - 185
MEMS MATERIALSClick to edit Master subtitle styleY.C. Tai 6/2/09 Short Course Y. C. Tai & W. C. TangCaltech Micromachining Lab11MEMS MaterialElectrical Properties -base from ICavailable data available data usually lack ofChemical Pr
Caltech - EE - 185
-10.1.cJlur~.Ill*J.olh.cII*.fYI*nanrityl. . . 2 3 ga 3 / +Hardn&. . 1 M o h l , M B J ~ ~ 1 , 1 ~ UuI*ce&.mu*. . Crz~:1.61*)X IOUdyrs/em* 1.6s- 7. .q,:0.6523 x lox* d p a / n a * 0.6 +? a:0.7959 x 101; dpa/cm* 0,776 T v ( o r e mcmcimudclutic
Caltech - EE - 185
VIBRATING WlRE FORCE SENSORSrMAGNETIC DRIVE I lMPEDANCE SENSE REQUIRES STATIC BIAS*TENSION LOAD AN INTERNAL FORCE DUE TO GRAVITY s GRAVIMETER APOLLO 17 (DECEMBER 1972): GRAVIMETER>*VIBRATING WIRE LUNARRESOLUTION 3.5 pg ACCURACY 20 pg DY
Caltech - EE - 187
USC - CSCI - 577
e0008a05e5423cd4d06d2775a0be758ab134db8c.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Elaboration Activity: Agile Artifact Review Exit Criteria: All concerns addressed Reviewer: Review Leader email: Review Leader pho
USC - CSCI - 577
Respond_Evaluation_LCADraft_QMP_F07a_T05.xls - Problem List CoverProject Name: Artifact: Module:Crsytalstairs dashboard QMPReview #: 1 Date: Activity: MBASE Phase/level:12/10/2007 Response0Type of review: Independent Review No. of Priorit
Allan Hancock College - WEEK - 2291
Tree Canopy Circumf Height Distance1 1112 530 5 222 910 320 6 193 1196 730 6 284 520 150 5 145 1580 740
USC - CSCI - 577
Explanation Log AAR Summary of LCA Draft Team 5 12/10/2007 CSCI 577a, Fall 2007Location TPC section 3 ConcernMissing Pre/Post Conditions in some test cases It should be section 3.2 rather than 3.5 Win conditions on the WinWin report are names "W
USC - CSCI - 577
Explanation Log AAR Summary of LCA Draft Team 5 12/10/2007 CSCI 577a, Fall 2007Location TPC section 3 TPC Section 3.5 SSRD ConcernMissing Pre/Post Conditions in some test cases It should be section 3.2 rather than 3.5 Win conditions on the WinWin r
USC - CSCI - 577
3b5d1544533e91b0eaaa7f80cf3cbe2ddcb23d30.xls - Areas of Concern LogProject Name: Artifact: Module: MBASE Phase/level: Activity: Exit Criteria: Reviewer: Review Leader email: Review Leader phone: Author: Crystal Stairs DashboardSID V2.2 ELABORATI