Copy of 460 - Exhibit - Budget Input Form (for student use)

Copy of 460 - Exhibit - Budget Input Form (for student use)...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Page 1 Company Name - PROJECT BUDGET INPUT FORM PROJECT: PARTIAL EXAMPLE Date: 1-20-09 Contract Type: Stipulated Sum Project Manager: Iam Awsome COST CODE DESCRIPTION QUANT. UNIT LABOR MATERIAL EQUIPMENT SUBCONTRACT OTHER TOTAL BUDGET (Cost codes are DIVISION 1 - GENERAL REQUIREMENTS the PM's discretion as long as they are CSI- based) DIVISION 2 - EXISTING CONDITIONS DIVISION 3 - CONCRETE $42,875 $42,550 $(325) 252 312113 1 Foundation 7S1.1 Trenching Layout 200 lf $450 $- $- $- $- $450 $- $(450) 252 312216 1 200 lf $1,400 $- $1,000 $- $- $2,400 $4,000 $1,600 252 031113 1 Foundation 7S1.1 Formwork inc. Layout 200 lf $3,500 $2,500 $- $- $- $6,000 $6,000 $- 252 032114 1 200 lf $800 $700 $- $- $- $1,500 $- $(1,500) 252 033113 1 Foundation 7S1.1 Place Concrete 200 lf $750 $500 $500 $- $- $1,750 $1,750 $- 252 039001 1 200 lf $1,200 $- $- $- $- $1,200 $1,200 $- 252 312113 2 Foundation 9S1.1 Trenching Layout
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/07/2008 for the course CSTM 460 taught by Professor Heustis during the Fall '07 term at Washington State University .

Page1 / 3

Copy of 460 - Exhibit - Budget Input Form (for student use)...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online