PROBLEM 20 Activity Days PredecesCrash DaCost Per Day A 12 2  $2,000.00  Activity LST Days B 16 4  $3,000.00  0 0 0 C 13 A 2  $800.00  A 0 12 D 14 A 4  $1,200.00  B 15 16 E 9 A 2  $1,000.00  C 12 13 F 12 C 2  $1,500.00  D 19 14 G 6 B,E 0  $-    E 22 9 H 4 C, D, E  2  $1,500.00  F 25 12 I 24 C, D, G 5  $1,300.00  G 31 6 12 F, H 3  $2,000.00  H 33 4 22 F, H 4  $2,500.00  I 37 24 L 8 I, J 2  $1,200.00  37 12 0 22 L 61 8 ZZZ 69 0 361 MAXIMIZ FROM  TO LHS 0 A 0 0 B 15 A C 12 A D 19 A E 22 B G 16 C F 13 C H 21 C I 25 D H 14 D I 18 E G 9 E H 11 F J 12 F K 12 G I 6 H J 4 H K 4 I L 24 J L 24 K ZZZ 32 L ZZZ 8   A   B   E   G   H
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/08/2008 for the course BA 311 taught by Professor Gariepy during the Spring '08 term at Stonehill.

Page1 / 2

march31class - PROBLEM 20 Activity Days Predecessor Crash...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online