HW 2 Problem 2 - Add Equipment Unit Number CEPCI 200 495.7...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Unit Number 200 CEPCI 495.7 User Added Equipment Exchangers Type of Exchanger MOC E-201 Floating Head 14.2 10 Carbon Steel / Carbon Steel 99.4 $31,500 $106,000 E-202 Floating Head 14.1 12.9 Carbon Steel / Carbon Steel 171 $41,300 $139,000 E-203 Floating Head 12.8 4 Carbon Steel / Carbon Steel 102 $31,900 $107,000 E-204 Floating Head 9.5 10 Carbon Steel / Carbon Steel 22 $22,900 $75,900 E-205 Fixed, Sheet, or U-Tube 9.3 4 Carbon Steel / Carbon Steel 101 $29,500 $97,700 E-206 Floating Head 6.6 10 Carbon Steel / Carbon Steel 83 $29,400 $97,500 E-207 Floating Head 6.3 4 Carbon Steel / Carbon Steel 22.7 $22,900 $75,300 E-208 Floating Head 6.6 4 Carbon Steel / Carbon Steel 22.8 $22,900 $75,400 Pump Type # Spares MOC P-201 Reciprocating 7.2 1 Carbon Steel 14.5 $42,400 $171,000 P-202 Centrifugal 1 1 Carbon Steel 10.4 $6,120 $24,600 P-203 Centrifugal 5.2 1 Carbon Steel 15 $8,010 $34,800 Towers Tower Description Tower MOC Demister MOC T-201 15.8 0.79 Carbon Steel 9.6 $33,500 $94,300 T-202 14.9 0.79 Carbon Steel 6.3 $37,000 $94,300 Vessels Orientation MOC Demister MOC V-201 Horizontal 2.89 0.96 Carbon Steel 9.3 $6,070 $22,200 V-202 Horizontal 2.53 0.85 Carbon Steel 6.3 $5,180 $16,200 Shell Pressure (barg) Tube Pressure (barg) Area (square meters) Purchased Equipment Cost Bare Module Cost Pumps (with drives) Power (kilowatts) Discharge Pressure (barg) Purchased Equipment Cost Bare Module Cost Height (meters) Diameter (meters) Pressure (barg) Purchased Equipment Cost Bare Module Cost 22 Stainless Steel Sieve Trays 26 Stainless Steel Sieve Trays Length/Height (meters) Diameter (meters) Pressure (barg) Purchased Equipment Cost Bare Module Cost Add Equipment Edit Equipment
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Name Total Module Cost Grass Roots Cost Utility Used Efficiency Actual Usage Annual Utility Cost E-201 $156,091 $221,000 Unspecified E-202 $204,000 $289,000 Unspecified E-203 $157,000 $223,000 Unspecified E-204 $112,000 $159,000 Unspecified E-205 $144,000 $205,000 Unspecified E-206 $144,000 $204,000 Unspecified E-207 $111,000 $158,000 Unspecified E-208 $111,000 $158,000 Unspecified P-201 $252,000 $338,000 Electricity 85.00% 8.47 kilowatts $4,260 P-202 $36,200 $48,600 Electricity 85.00% 1.18 kilowatts $592 P-203 $51,300 $67,500 Electricity 85.00% 6.12 kilowatts $3,080 T-201 $139,000 $183,000 NA T-202 $139,000 $184,000 NA V-201 $32,800 $44,200 NA V-202 $23,900 $33,700 NA Totals $1,810,000 $2,520,000 $7,930
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Material Classification Price ($/kg) Consumption (kg/h) Material Costs ($/y) methanol Raw Material $0.525 8000 $34,952,400 Acetone Product $(0.389) 30000 $(97,117,740) Economic Options Cost of Land $1,250,000 Taxation Rate 42% Annual Interest Rate 10% Salvage Value $739,000 Working Capital $4,169,000 $7,390,000 Total Module Factor 1.18 Grass Roots Factor 0.50 Economic Information Calculated From Given Information Revenue From Sales $93,360,000 $33,600,000 $3,516,200 $- $700,000 FCI L C RM (Raw Materials Costs) C UT (Cost of Utilities) C WT (Waste Treatment Costs) C OL (Cost of Operating Labor) Add Materials
Background image of page 4
Comd = 0.18*FCIL + 2.76*COL + 1.21*(CUT + CWT + CRM)
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 14

HW 2 Problem 2 - Add Equipment Unit Number CEPCI 200 495.7...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online