ass02_due090908

ass02_due090908 - ISE460 Fall 2008 Due 09/09/08 Team...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ISE460 Fall 2008 Assignment 02 Due 09/09/08 Team assignment! No.1 Read Chapter 8 before doing the homework! Scan ahead through chapter 3. This is the most fundamental and important chapter in the book – everything else depends on it. Familiarize yourself with some of the material before the lecture on 09/06 No. 2 (1 point) An executive from a large merchandising firm has called your vice-president for production to get a price quote for an additional 100 units of a given product. The vice-president has asked you to prepare a cost estimate. The number of hours re- quired to produce a unit is 5. The average labor rate is $12 per hour. The materials cost $14 per unit. Overhead for an additional 100 units is estimated at 50% of the direct labor cost. If the company wants to have a 30% profit margin, what should be the unit price to quote? No. 3 (2 point) Pearson Company manufactures a variety of electronic printed circuit boards (PCBs) that go into cellular phones. The company has just received an offer from an outside supplier to provide the electrical soldering for Pearson’s Motorola product line (Z-7
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 01/20/2009 for the course ISE 460 taught by Professor Bottlik during the Fall '06 term at USC.

Page1 / 3

ass02_due090908 - ISE460 Fall 2008 Due 09/09/08 Team...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online