S08_CEE%203014_3_Conceptual%20Design

S08_CEE%203014_3_Conceptual%20Design - CEE 3014...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1 1/21/2008 Virginia Tech - Prof. M. Garvin 1 CEE 3014 Construction Management Session 3 Virginia Tech - Prof. M. Garvin 2 DESIGN CONCEPT DOCUMENT BID START UP BUILD IMPROVE C 1. Concept Is there a need, what are the demands, what do we want built, how will we do it? C 2. Project Parameters Where will it be located, how will it be financed, when will it be complete? C 3. Prelim Estimate Have we done a similar one before, what do we think this one will cost C 4. Prelim Approval Will we satisfy the need, can it be funded, is it technically and financially feasible? D 1. Evolution How do we move from concept to final design, how do we optimize the design? D 2. Project Planning How will I assemble the project team, what is the contracting strategy? D 3. Parameter Estimate What are the main cost parameters, can I use these to refine the estimate? D 4. Funding Approval What are the cash flows, what are the risks, will this be a financial success K 1. Contract Drawings How do I develop the contract drawings, what role do they play? K 2. Contract Requirement What milestones must be met, what scheduling information is required? K 3. Engineers Estimate Based on the documents, what does the engineer believe the cost will be? K 4. Call for Bids What material do I assemble, what process do I use to call for bids? B 1. Designing Operations How do I design the construction operations needed to do the work? B 2. Bid Schedule How do I plan the work at bid stage, what are the main tasks, sequences and times B 3. Bid Estimate What methodologies are used to develop the contractor's bid estimate? B 4. Bidding How do I evaluate risk and reward to determine the final bid price? S 1. Mobilization What is needed to organize the construction team and mobilize the job? S 2. Baseline Schedule How do I go about developing the detailed construction schedule? S 3. Budget Development What is needed to convert the cost estimates in the bid into control budgets? S 4. Initial Review Do I have the organization, the plans and the controls needed for success? L 1. Field Operations What are the key issues and what problems will there be during actual construction? L 2. Short Term Planing What do I need to do to perform the work as planned and scheduled?
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 11

S08_CEE%203014_3_Conceptual%20Design - CEE 3014...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online