STUDY OUTINE FOR CHAPTER 14 MRP AND ERP 1. For which type of operation is MRP most appropriate? 2. Define the term dependent demand. 3. What is material requirements planning? 4. Briefly describe the three inputs for MRP. 1) 2) 3) 13-1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
5. Briefly define these terms: gross requirements scheduled receipts projected on hand net requirements planned order receipts planned order releases 6. What is lot-for-lot ordering? 7. What are the three primary MRP outputs (reports)?
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 13-2 1) 2) 3) 8. What is meant by the term lot sizing? 9. Four benefits of MRP are. 1) 2) 3) 4) 10. Three requirements of successful MRP are: 1) 2) 3) 11. MRPII is 13-3 12. What is closed loop MRP 13. What is ERP? 14. What are the three main reasons organizations undertake ERP? 1) 2) 3) 15. What are some of the hidden costs of ERP? 1) 2) 3) 4) 5) 6) 7) 13-4...
View Full Document

This note was uploaded on 04/16/2008 for the course M 1 taught by Professor N/a during the Spring '08 term at Baylor.

Page1 / 4

ch14_outline - 13-2 1) 2) 3) 8. What is meant by the term...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online