Setup (hrs) Fixture/Tooling ($) Run Time (hrs) Material ($) Mainshaft .7 200 .10 .60 Flywheel 1.25 2340 .25 2.25 Cylinder 5.0 220 .26 2.60 Piston 2.25 200 .06 .75 Crankdisk 2.0 1940 .20 1.50 Frame 1.0 2160 .22 2.60
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Cost Estimate of Air Motor Production Setup: 45x.7=$31.5, 45x1.25=$56.25, 45x5.0=$225, 45x2.25=$101.25, 45x2.0=$90, 45x1.0=$45 Tooling(per unit): 200/5000=$0.04, 2340/5000=$0.47, 220/5000=$0.05, 200/5000=$0.04, 1940/5000=$0.39, 2160/5000=$0.43 Run Time: 60x0.10=$6, 60x0.25=$15, 60x0.26=$15.60, 60x0.06=$3.60, 60x0.20=$12, 60x0.22=$13.20 Part Qty (1) ($) Qty (60) ($) Qty (400) ($) Qty (2000) ($) Mainshaft
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 38.14 75.90 327.50 1511.50 Flywheel 73.97 119.45 7144.25 35496.25 Cylinder 243.25 1320.00 7525.00 36725.00 Piston 105.64 364.65 1857.25 8881.25 Crank Disk 103.89 923.40 5646.00 27870.00 Frame 61.23 1018.80 6537.00 70300.00 Purchased Items 5.00 300.00 2000.00 10000.00 Total Cost/Lot 631.12 4122.20 31037.00 190784.00 Cost/Assembl y 631.12 68.70 77.59 95.39 Formulas: Setup + (Tooling x Qty) + (Run Time x Qty) + (Material x Qty) = Cost/Part 5.00 x Qty = Cost/Purchased Items Total Cost/Lot / Qty = Cost/Assembly...
View Full Document

This note was uploaded on 04/16/2008 for the course AERO 121 taught by Professor Dr.p during the Fall '08 term at Cal Poly.

Page1 / 3

cost - 38.14 75.90 327.50 1511.50 Flywheel 73.97 119.45...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online