Exercise 12.1 - Mahanaim Peterson Technical Writing Instructor Angel O'Keefe Exercise 12.1 1 A gas leak was the cause of a one-day delay in

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Technical Writing Instructor: Angel O'Keefe Exercise 12.1 9/9/07 1) A gas leak was the cause of a one-day delay in production. A gas leak caused a one-day delay. 2) The company has installed a microprocessor-controlled scanner in an effort to increase quality control of assembled components. To increase quality control of assembled components the company installed a microprocessor-controlled scanner. 3) Its our considered opinion that you will be able to start beta-testing the online preventative maintenance training program in the neighborhood of eight days before the scheduled completion date. You should be able to start beta-testing the online preventative maintenance training program eight days ahead of schedule. 4) If you have experience with any further problems with the Model 17 LCD panel, please do not hesitate to contact me at any time. Please contact me if you experience any problems with the Model 17 LCD panel. 5) The 4Tell software will be initiated as a means of
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This homework help was uploaded on 02/20/2008 for the course ENGL 216 taught by Professor Angelo'keefe during the Winter '07 term at DeVry Houston.

Page1 / 2

Exercise 12.1 - Mahanaim Peterson Technical Writing Instructor Angel O'Keefe Exercise 12.1 1 A gas leak was the cause of a one-day delay in

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online