Study Questions for Scheduling Material CEE 590 Fall, 2007 1. Consider the activity-on-arc project network shown below, with activity (task) durations (in days) listed alongside each arc. 1 2 3 4 5 7 6 B A C D J E G F H I 6 5 3 10 15 6 3 10 12 8 (a) What is the Earliest Start time for task I? (b) What is the Latest Finish time for task E? (c) What is the Earliest Finish time for task J? (d) How many days of total float does task H have? (e) How many days of free float does task D have? Answer: Doing the forward and backward passes through the network, we find the following (earliest, latest) time values for the event nodes: 1: (0, 0) 2: (5, 5) 3. (8, 8) 4: (14, 17) 5: (20, 20) 6: (20, 20) 7: (28, 28) From these values, we can compute the answers to parts (a) through (e): (a) 20 (b) 20 (c) 15 (d) 20 – 14 – 3 = 3 (e) 14 – 0 – 10 = 4
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2. In the following portion of an activity-on-arc project network, the task durations and calculated values for earliest time and latest time at the event nodes for two tasks are shown. Calculate the total float and free float for each of the two tasks, and explain how those values
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This homework help was uploaded on 02/20/2008 for the course CEE 5800 taught by Professor Wayno during the Fall '07 term at Cornell.

Page1 / 5

Sample_Questions_for_590_quiz - Study Questions for...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online