Lab #5 Differential Leveling-Part 2 2/18/08, 2/25/08 Gustavo Quiroz Ashley Dawn Chastain, Victoria Nicastro CVE 2080 Construction Measurements Lab Section 02
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Introduction: The purpose of this lab was to use a self level and a rod to be able to take backsight and foresight readings at turning points to be able to calculate elevations at turning points in any given closed or open traverse. Equipment: Self level Tripod Rod Rod level Procedure: The path taken for the group is as follows: as you enter Olin Engineering Building, go up the stairs and make a right and follow it all the way to the end until you reach the door. This was the Benchmark. Then make a left until the end of the hallway and this was turning point 1. Once at turning point 1 make a left and follow the hallway until the end was reached and this would mark turning point 2. At turning point 2 make a left and continue until the end of the hallway at which this would mark turning point 3. Then make a diagonal left turn until
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/18/2008 for the course CVE 2080 taught by Professor Drheck during the Spring '08 term at FIT.

Page1 / 3

Lab #5 - Lab #5 Differential Leveling-Part 2 2/18/08,...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online