ISYE 3133 Modeling5sol

ISYE 3133 Modeling5sol - ISyE 3133 C, Engineering...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ISyE 3133 C, Engineering Optimization Modeling Handout #5: Solutions 1. Gandhi Cloth Company is capable of manufacturing three types of clothing: shirts, shorts and pants. The manufacture of each type of clothing requires that Gandhi have the appropriate type of machinery available. The machinery needed to manufacture each type of clothing must be rented at the following rates: shirt machinery, $200 per week; shorts machinery, $150 per week; pants machinery, $100 per week. The manufacture of each type of clothing also requires the amounts of cloth and labor shown bellow. Each week. 150 hours of labor and 160 sq. yd. of cloth are available. The variable unit cost and selling price of each type of clothing are shown bellow. Formulate an IP whose solution will maximize Gandhi’s weekly profit. Clothing Type Labor (hours) Cloth (Square Yards) Shirt 3 4 Shorts 2 3 Pants 6 4 Clothing Type Sales Price ($) Variable Cost ($) Shirt 12 6 Shorts 8 4 Pants 15 8 page 480 of book. 2. Because of excessive pollution on the Momiss River, The state of
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 5

ISYE 3133 Modeling5sol - ISyE 3133 C, Engineering...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online