assignment2

assignment2 - University of Southern California Department...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
University of Southern California Department of Industrial and Systems Engineering ISE 310L Production I; Facilities and Logistics Spring 2000 Assignment 2 Dr. Ardavan Asef-Vaziri Due date March, 7, 2000
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1- Machine of a manufacturing cell are given below. Machine Operation Production Rate Machine Dimensions (Pieces/Hr) (m) 1 Turn O.D. 9 3.5 by 1.5 2 Bore I.D. 15 3.0 by 1.6 3 Face ends 10 2.5 by 1.5 4 Grind O.D. 12 3.0 by 1.5 5 Grind O.D. 12 3.0 by 1.5 6 Inspect 5 3.0 by 3.0 7 Drill 9 1.5 by 2.5 The FT chart is as follows 1 2 3 4 5 6 7 Warehouse 1 - 112 61 59 53 2 12 - 226 45 3 74 - 35 31 180 4 82 - 23 5 16 5 73 - 23 14 6 - 325 7 174 16 20 30 20 - Storage 25 300 75 - Machines 4 and 5 are similar, assignment of parts to two machines are arbitrary. The raw material is delivered into the cell by belt conveyor, and is sent out of the cell by another belt conveyor. Width of the conveyor is .4 m. Design 2 alternative layouts. Use FactoryCad and FactoryFlow and prepare 2 alternative layouts for this problem. In one layout use conveyor for material handling inside the cell.
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 4

assignment2 - University of Southern California Department...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online