FakePedicabupdated (1) - IN-BUILDING SOLUTION DESIGN...

Info icon This preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
_____________________________________________________________________________________________ MAPUA NORTH-NORTHWEST BUILDING Muralla St Barangay 658 Manila,Philippines Date Submitted: September 12, 2015 Submitted by: Fake Pedicab Inc. ________________________________________________________________ IN-BUILDING SOLUTION DESIGN PROPOSAL Approved by: Comments Name Sign & Date Nico Deffrey dela Pena
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
TABLE OF CONTENTS 1. Site Location Map 2. Building Summary 3. Material List / Bill of Quantity 4. Proposed Trunking Diagram 5. Proposed Antenna Locations & Intended Coverage 6. Proposed Equipment Location 7. Attachment Technical Specifications Walk Test Result and Analysis of Data 1 SITE LOCATION MAP
Image of page 3

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
2 BUILDING SUMMARY Overview Building Name: Mapua North-Northwest Building CIBI COORDINATES N 14°34'3" E 121°0'55"
Image of page 4
Address : Muralla St Barangay 658 Manila,Philippines No. of Floor/s: 4 Floors Pico RRU Configuration The Lampsite Design for the building will be an active solution system. For Mapua North-NorthWest Building , a total of 14 indoor PRRUs are proposed to be installed. An antenna distribution diagram indicating the number of PRRUs to be located on each floor is included Appendix 4. The detailed locations of the PRRUs are necessary to provide the required coverage as well as proposed cable routes are also indicated in Appendix 3. Building Description Floor Description No. of Antennas/Floor Ground Ground Floor 4 2nd Room 200-215 4 3rd Room 300-315 4 4th Room 400-415 2 TOTAL 14 Engineering Survey
Image of page 5

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Survey was conducted last August 31 and September 1, 2015 . Pre-installation Survey Upon acceptance of the proposal, a pre-installation survey will be carried out by Fake Pedicab Inc ., Inc. together with the contractors. Detailed cable routing & antenna location will be confirmed at this stage. Any existing building defects will be noted. The Building owner will be kept informed of any changes in the design proposal.
Image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern