BM1710ASSIGNMENT ON PRODUCTIVITY AND PROJECT MANAGEMENT1.Carbondale Casting produces cast bronze valves on a 10-person assembly line. On a recentday, 160 valves were produced during an 8-hour shift.a.What is their productivity?
01 Assignment 1*Property of STIPage 1 of 22.Kimpel Products makes pizza ovens for commercial use. James Kimpel, CEO, iscontemplating to produce smaller ovens for use in high school and college kitchens. Theactivities necessary to build an experimental model and related data are given in thefollowing table:ACTIVITYNORMALTIME(WEEKS)CRASHTIME(WEEKS)NORMALCOST(PHP)CRASHCOST(PHP)IMMEDIATEPREDECESSOR(S)A321,0001,600-B212,0002,700-C11300300-D731,3001,600AE638501,000BF214,0005,000CG421,5002,000D, EH532,0003,000F, G
b.John Goodale, the manager at Carbondale, changed the layout and was able toincrease production to 180 units per 8-hour shift. What is the new labor productivityper labor-hour?
c.What is the percentage of productivity increase?
BM171001 Assignment 1*Property of STIPage 2 of 2a.Draw a Gantt Chart using the normal time.12345678012345678NORMAL TIME(WEEKS)b.Draw the Activity on node (AON) network.

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 4 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
N/A

Unformatted text preview: B F 2 1 4,000 5,000 C G 4 2 1,500 2,000 D, E H 5 3 2,000 3,000 F, G BM1710 01 Assignment 1 *Property of STI Page 2 of 2 a. Draw a Gantt Chart using the normal time. 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 NORMAL TIME (WEEKS) b. Draw the Activity on node (AON) network. c. Determine the critical path. d. Solve for the slack time per activity. e. Solve for the crash cost per period. f. What activities should you crash if James Kimpel wants to reduce the project time to 15 weeks? Start A B C D E F H G BM1710 01 Assignment 1 *Property of STI Page 3 of 2 3. A renovation of the gift shop at Orlando Amway Center has six (6) activities (in hours). For the following estimates of a, m, and b, calculate the a) expected time and the b) standard deviation for each activity: Answer: Activity a m b t = a± 4m +b 6σ = b−a 6 Variance A 111519 15 1.331.77 B 2 7 314132 2.335.44 C 1 8 181818 D 8 131913.17 1.833.36 E 1 7 182018.17 0.5 0.25F 1 6 192219 1 1 ACTIVITY a m b A 111519 B 273141 C 181818 D 8 1319E 17 18 20 F16 19 22...
View Full Document

Newly uploaded documents

Show More

Newly uploaded documents

Show More

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture