Upload your study docs or become a
Course Hero member to access this document
Unformatted text preview: (5 items x 5 points) ACTIVITYNORMAL TIME (WEEKS) CRASH TIME (WEEKS) NORMAL COST (PHP) CRASH COST (PHP) IMMEDIATE PREDECESSOR(S) A 3 2 1,000 1,600- B2 1 2,000 2,700- C1 1 300300- D 7 3 1,300 1,600 A E 6 3 850 1,000 B F 2 1 4,000 5,000 C G 4 2 1,500 2,000 D, E H 53 2,0003,000 F, G a. Draw a Gantt Chart using the normal time. b.Draw the Activity on node (AON) network.c. Determine the critical path. d.Solve for the slack time per activity. e. Solve for the crash cost per period. f. What activities should you crash if James Kimpel wants to reduce the project time to 15 weeks? BM1710 01 Assignment 1 *Property of STI Page 1 of 2 3. A renovation of the gift shop at Orlando Amway Center has six (6) activities (in hours). For the following estimates of a, m, and b, calculate the a) expected time and the b) standard deviation for each activity: (2 items x 5 points) ACTIVITYa m b A 111519B 27 31 41C 18 18 18D 813 19 E17 18 20 F 16 19 22Expected activity time (t) = (a+4m + b) BM1710 01 Assignment 1 *Property of STI Page 2 of 2...
View
Full Document