Upload your study docs or become a
Course Hero member to access this document
Unformatted text preview: Once the custom millwork is completed, the mantels are immediately transported out the back door of the shop and sent on their way to retail millwork shops. Run 5 replications of one 8-hour day (480 minutes each) and report the estimated total time in the shop with both a point estimate and a confidence interval. With 95% confidence, what is the minimum amount of time the sheets would be expected to be in the factory? What would be the longest time? 1. Add a text label within the model itself. 2. Change the entity picture to a unique picture within the list of options (within the Entity data module). 3. In the attached worksheet, answer questions related to this assignment and save it with the title LASTNAME_Mod 2 Arena Assignment. 4. Attach BOTH your Arena model and your worksheet for this assignment....
View
Full Document