Lab 03 - MOAC 70-410 Installing and Configuring Windows...

Info icon This preview shows pages 1–4. Sign up to view the full content.

MOAC 70-410 - Installing and Configuring Windows Server 2012 R2 Lab Manual L AB 3 CONFIGURING LOCAL STORAGE THIS LAB CONTAINS THE FOLLOWING EXERCISES AND ACTIVITIES: Exercise 3.1 Exercise 3.2 Exercise 3.3 Lab Challenge Initializing Disks Creating Simple Volumes Creating a Storage Pool Removing Storage Components BEFORE YOU BEGIN The lab environment consists of computers connected to a local area network, along with a server that functions as the domain controller for a domain called adatum.com . The computers required for this lab are listed in Table 3-1. Table 3-1 Computers Required for Lab 3 Computer Operating System Computer Name Domain controller Windows Server 2012 R2 SERVERA Member server Windows Server 2012 R2 SERVERB Member server with three additional SCSI hard drives Windows Server 2012 R2 SERVERC In addition to the computers, you also require the software listed in Table 3-2 to complete Lab 3.
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

MOAC 70-410 - Installing and Configuring Windows Server 2012 R2 Lab Manual Table 3-2 Software Required for Lab 3 Software Location Lab 3 student worksheet Lab03_worksheet.docx (provided by instructor) Working with Lab Worksheets Each lab in this manual requires that you answer questions, create screen shots, and perform other activities that you will document in a worksheet named for the lab, such as Lab03_worksheet.docx. It is recommended that you use a USB flash drive to store your worksheets, so you can submit them to your instructor for review. As you perform the exercises in each lab, open the appropriate worksheet file, fill in the required information, and save the file to your flash drive. After completing this lab, you will be able to: Initialize new disks Create storage spaces, disks, and volumes with Server Manager Create volumes with the Disk Management snap-in Estimated lab time: 60 minutes Exercise 3.1 Initializing Disks Overview In this exercise, you use two different tools to bring three new disks online and initialize them in preparation for creating storage volumes. Mindset Adding disk drives is a common server hardware upgrade, requiring an administrator to prepare them for use. Completion time 15 minutes 1. Log on to the SERVERC computer, then, in Server Manager, click File and Storage Services. A File and Storage Services submenu appears (see Figure 3-1).
Image of page 2
MOAC 70-410 - Installing and Configuring Windows Server 2012 R2 Lab Manual Figure 3-1 The File and Storage Services submenu in Server Manager 2. Click Disks. The Disks page appears, showing one online disk and three offline disks.
Image of page 3

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

Image of page 4
This is the end of the preview. Sign up to access the rest of the document.
  • Spring '16
  • Douglas Hale
  • Windows 2000, USB flash drive, Microsoft Management Console, R2 Lab Manual

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern