Exercise: 1. Initiating the Project Q:  Which of the following processes comprise an Initiating Process Group?  Each correct answer represents a complete solution. Choose two. Develop Project Charter Define Scope Develop Project Management Plan Identify Stakeholders Explanation:  Answer options A and D are correct.  The Initiating Process Group consists of the Develop Project Charter and  Identify Stakeholders processes. These processes define a new project or  new phase of an existing project by obtaining authorization to start the project  or phase.  Q: Which of the following is not a project selection method?   Scoring model Cost-benefit analysis Expert judgment Page 1 of 39
Image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Top-down estimating Explanation: Answer option D is correct.  Cost-benefit analysis, expert judgment, and scoring are all project selection  techniques. Top-down estimation is a type of cost estimation. For more  information, please see Chapter 1. Q:  Select the three types of project selection methods that are considered  economic model methods. NPV Cost-benefit analysis Discounted cash flow Payback period IRR Scoring model Explanation:  Answer options C, A, and E are correct.  An economic model includes discounted cash flow, NPV, and IRR. Benefit  measurement methods include cost-benefit analysis, a scoring model, and a  payback period. Q:  In what organizational structure is a project manager often referred to as  project coordinator or expeditor? Page 2 of 39
Image of page 2
Strong matrix Weak matrix Balanced matrix Project-based Explanation:  Answer option B is correct.  Weak matrix structures are similar to functional structures; project managers  are often called project coordinators or expeditors.  Answer option A is incorrect because project managers exist within the strong  matrix structure.  Answer option C is incorrect because project managers function as such in  the balanced structure.  Answer option D is incorrect because project managers are not called  expeditors or coordinators in the project-based structure. Lesson:  Initiating the Project Objective:  Understanding Organizational Structures Q:  Which of the following is the  least  precise cash-flow technique? Net present value Internal rate of return (IRR Discounted cash flows Page 3 of 39
Image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Payback period estimate Explanation:  Answer option D is correct.  The payback period is a cash-flow technique for identifying the length of time  it takes for the organization to recover all the costs of producing the project. It  compares the initial investment to the expected cash inflows over the life of  the project and determines how many time periods elapse before the project  pays for itself. Payback period is the least precise of all cash-flow techniques.
Image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern