AC2720_Analysis 4.2_Template - Target manufacturing cost...

Info icon This preview shows pages 1–13. Sign up to view the full content.

View Full Document Right Arrow Icon
Assignment 13-17 template Target operating income, value-added costs, service c Part 1: How much of the total cost is Value added. Non- value -adde
Image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
company. ed, or in the gray area. Follow the example provided for the first item:
Image of page 2
Image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Problem 2 Target prices, target costs, activity-based costing. Part 1: Snappy’s operating income in 2013 is as follows
Image of page 4
Total for
Image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Problem 3 Target costs, effect of product-des Part 1 and 2: Year 2012 Direct materials Batch-level costs Manuf. operations costs Engineering change costs Total Part 3:: = x 95% = Please use this space to type your answer to part 3: Part 4: Please use this space to type your answer to part 4: Total (1) Per Unit (2) = (1) / # of units Target manufacturing cost per unit of HJ6 in 2013 Manufacturing cost per unit in 2012 Target manufacturing cost
Image of page 6
Image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 8
Image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 10
Image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 12
Image of page 13
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Target manufacturing cost per unit of HJ6 in 2013 Manufacturing cost per unit in 2012 Part 5: Please use this space to type your answer to part 5: sign changes on product costs Year 2013 Total (3) Per Unit (4) = (3) / # of units Problem 4 Target costs, effect of product-desig Part 1 and 2: Year 2012 Consultation labor Cost of new contacts Travel costs Preparing and filing costs Total Part 3:: Target cost per audit in 2013 = Cost per audit in 2012 × 95 Target cost per audit in 2013 = Please use this space to type your answer to part 3: Part 4: Please use this space to type your answer to part 4: Total (1) Per Unit (2) = (1) / # of units gn changes on product costs Year 2013 5% Total (3) Per Unit (4) = (3) / # of units...
View Full Document

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern