coffee_proj - g. Z2 <= .25 * Final 4 h....

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Maximize: Z=(W1*.75)+(W2*.55)+(W3*.4)+(X1*1)+(X2*.8)+(X3*.65)+(Y1*1.4)+(Y2*1.2)+(Y3* 1.05)+(Z1*.9)+(Z2*.7)+(Z3*.55) Constraints: a. W1 <= .3 * Final 1 b. Y2 >= .2 * Final 3 c. X1 >= X2 d. W2 <= .4 * Final 1 e. X3 >= .25 * Final 2 f. Z2 >= .1 * Final 4
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: g. Z2 &lt;= .25 * Final 4 h. (W1+X1+Y1+Z1) &lt;= 150,000 i. (W2+X2+Y2+Z2) &lt;= 60,000 j. (W3+X3+Y3+Z3) &lt;= 100,000 k. Final 1 &lt;= 100,000 l. Final 1 &gt;= 40,000 m. Final 2 &gt;= 60,000 n. Final 3 &gt;= 30,000 o. Final 4 &gt;= 50,000...
View Full Document

This note was uploaded on 04/21/2008 for the course BUS 111 taught by Professor Budnick during the Spring '08 term at Rhode Island.

Ask a homework question - tutors are online