mswch10hw - 10-5) 1. a. the approximate size of the leading...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 10-5) 1. a. the approximate size of the leading platform, from Fig, 10-2 is 100 ft x 80 ft, 6 loading hoppers. b. assume that 6 trucks can unload at the same time, one per trailer hopper. c. Assume the total time required to get a collection vechile unloaded including the time spent driving onto the loading platform, unloading and driving off the loading platform, and the time needed to clean the platform between collection vechicles is 10 min. d. Max number of collection vechiles that can be handled per hour is: Trucks/hr = 60 min/hr / 10 min/cycle (6 trucks/cycle) = 36 trucks/hr 2. capacity = 36 trucks/hr (15 yd3/truck) (475 lb/yd3) (ton/2000 lb) = 128 ton/hr 10-6) 1. a. the approximate size of the leading platform, from Fig, 10-3 is 146 ft x 80 ft, 8 loading hoppers. b. assume that 8 trucks can unload at the same time, one per trailer hopper. c. Assume the total time required to get a collection vechile unloaded including the time spent driving onto the loading platform, unloading and driving off the...
View Full Document

Page1 / 2

mswch10hw - 10-5) 1. a. the approximate size of the leading...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online