Problem4-16 - 14 14 Maximum Hours of Availability Operator...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
4.16 Contribution Toward Required Amount per Unit Shipped Shipping Lanes Requirement M1-S1 M1-S2 M2-S1 M2-S2 S1-P S2-P Totals M1 1 1 0 0 0 0 40 = M2 0 0 1 1 0 0 60 = S1 -1 0 -1 0 1 0 0 = S2 0 -1 0 -1 0 1 0 = P 0 0 0 0 1 1 100 = Capacity 30 30 50 50 70 70 Unit Cost $2,000 $1,700 $1,600 $1,100 $400 $800 $212,000 Solution 30 10 10 50 40 60
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
40 60 0 0 100 Required Amount
Background image of page 2
4.22 Hours Assigned per Day Operator Mon Tue Wed Thu Fri Totals KC 3 0 2 0 4 9 >= 8 DH 0 2 0 6 0 8 >= 8 HB 4 7 4 0 4 19 >= 8 SC 5 5 5 0 5 20 >= 8 KS 2 0 3 2 0 7 >= 7 NK 0 0 0 6 1 7 >= 7 Totals 14 14 14 14 14 70 Total Cost: = = = = = 14 14 14
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 14 14 Maximum Hours of Availability Operator Mon Tue Wed Thu Fri KC 6 6 6 DH 6 6 HB 4 8 4 4 SC 5 5 5 5 KS 3 3 8 NK 6 2 Minimum Guarantee $10.00 $10.10 $9.90 $9.80 $10.80 $11.30 $709.60 Hourly Wage...
View Full Document

{[ snackBarMessage ]}

Page1 / 4

Problem4-16 - 14 14 Maximum Hours of Availability Operator...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online