250_Hwk_Chapter_5A

250_Hwk_Chapter_5A - ACCT 250 HOMEWORK CHAPTER 5A E5-30 a b...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
HOMEWORK CHAPTER 5A a8275c409eafe82e4f55f03a033057545bcf875e.xls PAGE 1 OF 2 E5-30 Activity Classification Driver a Machine operation Unit Units of production b Machine setup Batch Number of batches c Production scheduling Batch Number of batches d Materials receiving Product Number of receipts e Research and development Product Number of hours f Machine maintenance Facility Number of machine hours g Product improvement Product Number of modifications h Parts administration Product Number of parts I Final inspection Batch Number of inspections j Materials handling Batch Pounds of materials moved E5-34 Units of Pool Cost Driver Rate Machine setup 360,000 3,000 120.00 per setup hour Materials handling 100,000 25,000 4.00 per pound of material Electric power 40,000 40,000 1.00 per kilowatt-hour Units of Driver Cost Cost category Job A Job B Job A Job B Direct materials 40,000 50,000 Direct labor 24,000 40,000 Machine setup 200 240 24,000 28,800 Materials handling 1,000 3,000 4,000
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This homework help was uploaded on 04/18/2008 for the course ACCTG 250 taught by Professor Rabe during the Spring '08 term at Luther.

Page1 / 2

250_Hwk_Chapter_5A - ACCT 250 HOMEWORK CHAPTER 5A E5-30 a b...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online