250_Hwk_Chapter_4C

250_Hwk_Chapter_4C - ACCT 250 HOMEWORK CHAPTER 4C E4-34 1...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ACCT 250 HOMEWORK CHAPTER 4C d1bd42bfdb0d1944ef9da8074ad69b068e9efeaa.xls PAGE 1 OF 3 E4-34 1 Conversion costs Cutting 45,000 Assembling 22,500 Finishing 15,000 Total conversion costs 82,500 Cost Job Size Quantity DM Conv Total Average 401 Med 5,000 20,000 27,500 47,500 9.50 402 Large 10,000 50,000 55,000 105,000 10.50 Total 15,000 70,000 82,500 152,500 10.17 2 WIP: Cutting - Job 401 20,000 WIP: Cutting - Job 402 50,000 Raw materials inventory 70,000 WIP: Cutting - Job 401 15,000 WIP: Cutting - Job 402 30,000 Conversion costs applied: Cutting 45,000 WIP: Assembling - Job 401 35,000 WIP: Assembling - Job 402 80,000 WIP: Cutting - Job 401 35,000 WIP: Cutting - Job 402 80,000 WIP: Assembling - Job 401 7,500 WIP: Assembling - Job 402 15,000 Conversion costs applied: Assembling 22,500 WIP: Cutting - Job 401 42,500 WIP: Cutting - Job 402 95,000 WIP: Finishing - Job 401 42,500 WIP: Finishing - Job 402 95,000 WIP: Finishing - Job 401 5,000 WIP: Finishing - Job 402 10,000 Conversion costs applied: Finishing
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/18/2008 for the course ACCTG 250 taught by Professor Rabe during the Spring '08 term at Luther.

Page1 / 3

250_Hwk_Chapter_4C - ACCT 250 HOMEWORK CHAPTER 4C E4-34 1...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online