Chap 5 Pr 15

Chap 5 Pr 15 - Phelim Lennon February 21st, 2008 Chapter 5...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Phelim Lennon February 21st, 2008 Chapter 5 Problem 15 Activity Cost Driver Amount of Driver Enginering Desig $120,000 Engineering hr 3,000 Purchasing $80,000 Num. of parts 10,000 Other overhead $250,000 Direct labr hou 40,000 Job 60 Job 61 Job 62 Job 63 Job 64 Bal, July 1 $32,450 $40,770 $29,090 $0 $0 Direct Materials $26,000 $37,900 $25,350 $11,000 $13,560 Direct Labor $40,000 $38,500 $43,000 $20,900 $18,000 Engineering hrs 20 10 15 100 200 Num. of parts 150 180 200 500 300 Direct labor hrs 2,500 2,400 2,600 1,200 1,100 1. Activity Rates Enginering Desig $120,000 / 3000 $40 Purchasing $80,000 / 10,000 $8 Other overhead $250,000 / 40,000 $6.25
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2. For: Zavner Company Job Number: 60 Direct MaterialsDirect Labor Applied Overhead Activity Driver Activity Rate Enginering Desig 20 $40.00 $800 Purchasing 150 $8.00 $1,200 Other overhead 2,500 $6.25 $15,625 $26,000 $40,000 $17,625 Total Cost: $83,625 For: Zavner Company Job Number: 61 Direct MaterialsDirect Labor
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

Chap 5 Pr 15 - Phelim Lennon February 21st, 2008 Chapter 5...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online