BUAD 311 HW #1

BUAD 311 HW #1 - Prof. Bayiz BUAD 311 HW #1 January 28,...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Prof. Bayiz BUAD 311 HW #1 January 28, 2008 1.                  No                         Yes 2.  Process Capacity Shirt Type        Label (minutes)     x     Demand   =   Time       Branding (minutes)     x     Demand     =   Time A         4 20      80 6.5            20     130.0 B       10   5               50 6.5   5                32.5 C         5 25    125   6.5 25              162.5 D         6 10      60 6.5 10                65.0 E         8 15    120 6.5 15                97.5 Total Time in minutes  - 435   - 487.5 Total Time Allotted in minutes      480   480.0 Capacity to satisfy the demand    +55 – YES!                      - 7.5 – NO! There is not enough time for the branding machine to fill the demand desired. 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

BUAD 311 HW #1 - Prof. Bayiz BUAD 311 HW #1 January 28,...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online