MGMT 361 Question-HW2-Fall16 - MGMT361 Fall 2016 Homework 2...

This preview shows page 1 - 3 out of 5 pages.

The preview shows page 1 - 3 out of 5 pages.
MGMT361 Fall 2016 Homework 2Due Monday Sep 19Section time:.Name:.Q1-Q2 require materials from lecture “Gantt Chart II” (Sep 9). Q3 requires materials from lecture“Little’s Formula” (Sep 12).Question 1 (3+4+4 = 11 points)Consider the Chipotle example we discussed in the class. But this time, both workers M1 and M2 need alonger time to finish their tasks (the activity times change to 100 seconds and 60 seconds, respectively).a)Calculate the followingdesignparameters for this process:Cycle time (CT) for Stage 1sec / unitCT for Stage 2sec / unitBottleneckStage:Process Designed CTsec / unitProcess Capacityunits / hour
b)Customers arrive to this Chipotle in the following way: At time 0, 120 sec, 240 sec, 360 sec, …,twocustomers arrivetogether, and M1 and M2 each takes a customer to serve. At time 60 sec,180 sec, 300 sec,onecustomer arrive and M2 (the faster worker) serves him/her. Draw theGantt chart from time 0 to time 300 sec. Each grid in the following chart represents 10 seconds.You can extend the below chart as needed.

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 5 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Spring
Professor
panwalker
Tags
Management, M3 Half track, M2 Browning machine gun, M4 Sherman, Copenhagen Metro, M4 motorway

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture