bridge - TO FROM Subject Date Ostrovskaya Writing a...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
TO: Ostrovskaya FROM: Subject: Writing a technical memorandum Date: September 4, 2007 Summery The campus wants its own students to come up with plausible designs and a scale model for the task at hand,building a bridge. Students are divided into groups of four with each student making their own design and testing it through a scale model made with a super mag kit. The specifications for the scale model are 4.3-5.3 inches long and 1-2 inches high. The bridge will be tested by distributing a load of two pounds, it must be stable while also cost efficient. What i plan to do is use triangles for structure stability on the sides with squares on the bottom and the top. Method Using triangles on the side of my bridge helps even out the load weight while making the floor stable. For the floor and the top i used three squares. The two ends have cross beams and the center has a cross with a ball joint which has beams reaching up to the sealing for three dimensional stability. I first started with the two
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/02/2009 for the course ENGR 111 taught by Professor Walker during the Fall '07 term at Texas A&M.

Page1 / 2

bridge - TO FROM Subject Date Ostrovskaya Writing a...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online