Suggested Process Improvements

Suggested Process Improvements - Courtney Howder, Kristin...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Courtney Howder, Kristin Lo, Johnson Mark, Michael Mark, Amy Raffa, Alvin So IOE 425 Prof. Anderson 26 November 2008 Suggested Process Improvements Operation 1 1. Place the suspension arm located in the raw material bin at waist level to eliminate the waste of motion due to bending down. This placement change would also provide safety benefits in protecting the operator’s back. 2. Move the slide rack and machines closer to the operator to eliminate any type of wasted movement such as walk time. The operator adds non-value added waste due to the locations of these things. 3. If possible (if standards and regulations permit), use a shorter slide rack to allow for more space and reduce transfer time between the first and second operation. A shorter slide rack should also be used between operation 2 and 3 as well. Operation 2 1. Install a new grease gun that is located on top of the press. This way the waste in reaching for the grease gun can be greatly reduced. 2.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

Suggested Process Improvements - Courtney Howder, Kristin...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online