Tuttle_TaktTime&Pitch

Tuttle_TaktTime&Pitch - Demand per shift(needed to...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Available work time per shift (in seconds) =
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Demand per shift (needed to be met) = Takt Time = Pitch =...
View Full Document

This note was uploaded on 03/11/2009 for the course IOE 310 taught by Professor Saigal during the Winter '08 term at University of Michigan.

Ask a homework question - tutors are online