CE 102 - Estimated Costs - 8 $1,114,259.19 9 $1,181,114.74...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Estimated Costs Unit(s) Cost per Unit Expected Life (yrs) Cost New Asphalt 53400 $10.00 30 $534,000.00 Sidewalk Demolition 150 $15.00 30 $2,250.00 Move light pole 4 $10,000.00 30 $40,000.00 Landscape Removal 2 $5,000.00 30 $10,000.00 Landscape Addition 10 $35.00 30 $350.00 New Sidewalk 500 $25.00 30 $12,500.00 Fixed Expense 1 $100,000.00 30 $100,000.00 TOTAL $699,100.00 Year Uniform Annual Cost 0 $699,100.00 1 $741,046.00 2 $785,508.76 3 $832,639.29 4 $882,597.64 5 $935,553.50 6 $991,686.71 7 $1,051,187.91
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 8 $1,114,259.19 9 $1,181,114.74 10 $1,251,981.62 11 $1,327,100.52 12 $1,406,726.55 13 $1,491,130.15 14 $1,580,597.96 15 $1,675,433.83 16 $1,775,959.86 17 $1,882,517.45 18 $1,995,468.50 19 $2,115,196.61 20 $2,242,108.41 21 $2,376,634.91 22 $2,519,233.01 23 $2,670,386.99 24 $2,830,610.21 25 $3,000,446.82 26 $3,180,473.63 27 $3,371,302.05 28 $3,573,580.17 29 $3,787,994.98 30 $4,015,274.68...
View Full Document

This note was uploaded on 03/15/2009 for the course CE 102 taught by Professor Trimmer during the Spring '09 term at Oregon State.

Page1 / 2

CE 102 - Estimated Costs - 8 $1,114,259.19 9 $1,181,114.74...

This preview shows document pages 1 - 2. Sign up to view the full document.