CEE_595_2008_Harrisville_Bar_Chart

CEE_595_2008_Harrisville_Bar_Chart - Bar Chart or Time...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Bar Chart or Time Scaled Diagram Act ID Description Duration Early Start April 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 May 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 June 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 July 4 5 6 7 1000 1010 1020 1030 1031 1032 1033 1034 1040 1050 1060 1070 1080 1090 1100 1110 1120 1121 1130 1140 1160 1170 1180 1190 1200 1210 1220 1240 1250 1260 1270 1280 1290 1. Mobilization 2. Clear the land 3. Excavate the Trenches 4. Form and Pour the Foundation Footer 5. Form Concrete Walls 6. Place Reinforcing Steel 7. Pour Concrete Foundation Walls 8. Let the concrete cure [2 days] before backfill can occur 9. Backfill interior and exterior of foundation walls 10. Prepare Slab on Grade [stone, vapor barrier, etc.] 11. Rough-in under-slab electrical 12. Rough-in under-slab Plumbing 13. Concrete Slab-on-Grade 14. Masonry exterior and interior CMU and door frames 15. Electrical conduit in walls [switches and devices] 16. Structural Steel and Deck 17. Install Scaffolding 18. Exterior Masonry Brick Façade 19. Rough Carpentry and Blocking 20. Roofing 22. Ductwork for heating and air conditioning 23. Electrical Conduit 24. Exterior windows and doors 25. Install electrical fixtures 26. Insulate, weatherstrip and caulk 27. Install tile flooring 28. Install suspended acoustical ceilings 30. Install cabinetry and furnishings 31. Paint walls and frames 32. Seed, Mulch and Landscape 33. Certificate of Occupancy 34. Float Completion Cummulative Working Days August 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 September 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 October 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 ...
View Full Document

Ask a homework question - tutors are online