CEE_595_2008_Harrisville_Schedule_Blank

CEE_595_2008_Harrisville_Schedule_Blank - CEE 595 Final...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
CEE 595 Final Data Sheet Name Act ID Description Man-hours Crew Size Duration (Days) Predecessors Successors Contractor 1000 8 1.0 1 X 1010 ALL 1010 80 2.0 1000 1020 SW 1020 48 3.0 2 1010 1030 SW 1030 4.0 0 1020 1031 GC 1031 4.0 0 1030 1032 GC 1032 2.0 0 1031 1033 GC 1033 6.0 0 1032 1034 GC 1034 1.0 0 1033 1040 GC 1040 96 2.0 6 1034 1050, 1060, 1070, 1120, 1260 SW 1050 2.0 0 1040 1080 GC 1060 48 2.0 3 1040 1080 EC 1070 64 2.0 4 1040 1080 PC 1080 5.0 0 1050, 1060, 1070 1090 GC 1090 6.0 0 1080 1100, 1110, 1120, GC 1100 160 2.0 1090 1170 EC 1110 72 3.0 3 1090 1110 GC 1120 3.0 0 1040, 1090 1121 GC 1121 6.0 0 1120 1180 GC 1130 2.0 0 1110 1140 GC 1140 192 8.0 3 1130 1170, 1250 GC 1160 32 2.0 2 1110 1220 HC 1170 96 3.0 1100. 1140 1190, 1240 EC 1180 2.0 0 1121 1200 GC 1190 100 6 1170 1270 EC 1200 56 5 1180 1270 GC 1210 48 8 1250 1270 GC 1220 120 4 1160, 1250 1270 GC 1240 180 6 1170, 1220 1270 OWNER 1250 120 1.9 8 1140 1190, 1200, 1210, 1220, 1240, 1290 GC 1260 80 0.5 20 1040 1290 SW 1270 8 1.0 1 1190, 1200, 1210, 1220, 1240, 1290 1280 ALL 1280 120 1.0 15 1270 1290 ALL 1290 Completion 0 0.0 0 1280 X ALL 1. Mobilization 2. Clear the land (which may include demolition of existing structures) 3. Excavate the land (which may include digging holes and leveling) 4. Form and Pour the Foundation Footer 5. Form Concrete Walls
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/29/2009 for the course CEE 5950 taught by Professor Carr during the Fall '08 term at Cornell University (Engineering School).

Ask a homework question - tutors are online