Cornell University Department of Civil and Environmental Engineering CEE 595 – Construction Planning and Operations Management of The Construction Process for Professionals Professor Paul G. Carr, Ph.D., P.E. Lecture 4 Friday 11:15 – 2:00 366 Hollister Hall
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Housekeeping Items •Pau l G . Carr • Cell Phone: (315) 783-3637 • 315 Hollister Hall Posting Readings on the Web • READINGS – – AIA B 141 – Readings on Professional Services – PEO Fees – NSPE Agreements – Article on DBIA Risks – What to do when a Contractor goes Belly-up?
Background image of page 2
Syllabus, will change as the Semester flows Course Syllabus CEE 595 Construction Planning and Operations 2008 Topic 29-Aug Module 1 Introduction and Course Objectives Module 2 Conceptual Design and Estimating (Owner) 5-Sep Introduction to Planning, Design, Estimating and Scheduling Module 3 When Projects Go Bad - Introduction to Disputes and Resolution 12-Sep Conceptual Design and Estimating Location, Time, Scope Inter-Relationship of Construction Participants & Pre- Design 19-Sep Construction Contracts - LS, DB, CM at Risk, CM, DBB, etc. A/E Planning & Design Contract Obligations 26-Sep Issues During Construction; Award, Agreement, Time, Changes, Payments Bid Package (Decision to Bid; Notice, Information to Bidders, Bid Form) 3-Oct General Conditions to the Contract - The Rules Introduction to Estimating Concept of the Estimate 10-Oct Introduction to Scheduling Concept and Value of Time Review Session Lessons Learned 17-Oct Exam No. 1 Plans Distributed 24-Oct Project Estimate Concrete Slab and Walls Project Estimate Masonry, Carpentry and Exterior Walls 31-Oct Project Estimate Structural , Metals, Roofing, Waterproofing Wage Rates and Labor Specialties and Quotations 7-Nov Bid Due Dispute Resolution Assignment of Case 14-Nov Work Sessions Case Preparation Work Sessions Case Preparation 21-Nov Alternative Dispute Resolution Mediation, Arbitration, Mini-Trial, Litigation 28-Nov Thanksgiving Break 5-Dec Organized Crime, Corruption and Influence In the Construction Industry Hand out Final Dates/Session General echanical Vertical Systems
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Team Assignment… Samaritan Medical Center In Watertown, New York Is constructing a new Hospital Pavilion that will displace 380 parking spaces. A new four story Garage must be built in existing an Parking Lot area, and the area of the Garage footprint will be 45,000 square feet The Project was put out as a Design Build Contract in January 2007 and that plan was abandoned If a Design - Bid - Build Plan is established, and the Garage and Pavilion will be under construction by January 2009… How Many Cars will it hold? Spaces How Big Will The Garage Be? Square Footage How Much Will it cost? $ Construction Costs Budget Hint – The Garage will be a ground level and three stories.
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/29/2009 for the course CEE 5950 taught by Professor Carr during the Fall '08 term at Cornell University (Engineering School).

Page1 / 54

CEE_595__Lecture_4_2008_Web - Cornell University Department...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online