CEE_595_Estimate_Concrete_Harrisville_Template_II_2008

CEE_595_Estimate_Concrete_Harrisville_Template_II_2008 -...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Crew Rates Quantity Rate Fringes Wages Comp SS/Unemp Med Total Concrete Formwork 19.90% 7.80% 1.65% Carpenter Foreman 0.1 $0.00 $0.00 $0.00 $0.00 $0.00 Carpenter 0.7 $0.00 $0.00 $0.00 $0.00 $0.00 Laborer 0.2 $0.00 $0.00 $0.00 $0.00 $0.00 Labor rate per crew hour $0.00 Equipment Cost $0.00 Crew Cost per M-H $0.00 ="cfor" Concrete Placing Quantity Rate Fringes Wages Comp SS/Unemp Med Total Carpenter 0.2 $0.00 $0.00 $0.00 $0.00 $0.00 Labor Foreman 0.2 $0.00 $0.00 $0.00 $0.00 $0.00 Laborer 0.6 $0.00 $0.00 $0.00 $0.00 $0.00 Labor rate per crew hour $0.00 Equipment Cost $0.00 Crew Cost per M-H $0.00 ="cpc" Concrete Finishing Quantity Rate Fringes Wages Comp SS/Unemp Med Total Finishing Foreman 0.1 $0.00 $0.00 $0.00 $0.00 $0.00 Laborer 0.9 $0.00 $0.00 $0.00 $0.00 $0.00 Labor rate per crew hour $0.00 Equipment Cost $0.00 Crew Cost per M-H $0.00 ="cfin" Carpentry Crew Quantity Rate Fringes Wages Comp SS/Unemp Med Total Carpenter Foreman 0.1 $0.00 $0.00 $0.00 $0.00 $0.00 Carpenter 0.7 $0.00 $0.00
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/29/2009 for the course CEE 5950 taught by Professor Carr during the Fall '08 term at Cornell University (Engineering School).

Page1 / 5

CEE_595_Estimate_Concrete_Harrisville_Template_II_2008 -...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online