CEE_595__Lecture_2_2008_Web

CEE_595__Lecture_2_2008_Web - Cornell University Department...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Cornell University Department of Civil and Environmental Engineering CEE 595 – Construction Planning and Operations Management of The Construction Process for Professionals Professor Paul G. Carr, Ph.D., P.E. Lecture 2 Friday 11:15 – 2:00 366 Hollister Hall Housekeeping Items • Paul G. Carr • Cell Phone: (315) 783-3637 • 315 Hollister Hall • INTRODUCTION OF Jesse INTRODUCTION OF Jesse Negherbon Negherbon [TA] [TA] • Text – Construction Contracting – Clough 7 th Edition • Attendance Policy: Attendance is a matter of importance to the learning process, it is also a matter of respect , therefore attendance must be considered in your final grade. I know there are times that other class trips for example will cause a problem, however I need to know in order that you not be unfairly treated for such an absence. Illness is another example. I will make myself available to the maximum degree possible to make-up for missed classes. Syllabus, will change as the Semester flows ourse Syllabus CEE 595 Construction Planning and Operations 2008 Topic 29-Aug Module 1 Introduction and Course Objectives Module 2 Conceptual Design and Estimating (Owner) 5-Sep Module 2 Introduction to Planning, Design, Estimating and Scheduling Module 3 When Projects Go Bad - Introduction to Disputes and Resolution 12-Sep Module 1 Conceptual Design and Estimating Location, Time, Scope Module 1 Inter-Relationship of Construction Participants & Pre- Design 19-Sep Module 1 Construction Contracts - LS, DB, CM at Risk, CM, DBB, etc. Module 1 A/E Planning & Design Contract Obligations 26-Sep Module 1 Issues During Construction; Award, Agreement, Time, Changes, Payments Module 1 Bid Package (Decision to Bid; Notice, Information to Bidders, Bid Form) 3-Oct Module 1 General Conditions to the Contract - The Rules Module 2 Introduction to Estimating Concept of the Estimate 10-Oct Module 2 Introduction to Scheduling Concept and Value of Time Module 2 Review Session Lessons Learned 17-Oct Module 2 Exam No. 1 Module 2 Plans Distributed 24-Oct Module 2 Project Estimate Concrete Slab and Walls Module 2 Project Estimate Masonry, Carpentry and Exterior Walls 31-Oct Module 2 Project Estimate Structural , Metals, Roofing, Waterproofing Module 2 Wage Rates and Labor Specialties and Quotations 7-Nov Module 2 Bid Due Module 3 Dispute Resolution Assignment of Case 14-Nov Module 3 Work Sessions Case Preparation Module 3 Work Sessions Case Preparation 21-Nov Module 3 Alternative Dispute Resolution Module 3 Mediation, Arbitration, Mini-Trial, Litigation 28-Nov Module 3 Thanksgiving Break Module 3 5-Dec Module 3 Organized Crime, Corruption and Influence In the Construction Industry Module 3 Hand out Final Dates/Session General echanical Vertical Systems On - Time On - Budget Delivering Performance The integration of Planning and Design: • Site Engineering • Geo-Technical Engineering • Structural Engineering • Mechanical Engineering • Electrical Engineering • Data and Communications Networks • Architecture • AND THEN BUILD IT!...
View Full Document

This note was uploaded on 03/29/2009 for the course CEE 5950 taught by Professor Carr during the Fall '08 term at Cornell.

Page1 / 54

CEE_595__Lecture_2_2008_Web - Cornell University Department...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online