hw 12 - 8.17 Project D B A C E 0 (10,000.00) (10,000.00)...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
8.17 Project 0 1 2 3 D  $(10,000.00) 12000 0 0 B  $(10,000.00) 6000 4000 2000 A  $(10,000.00) 4000 4000 4000 C  $(10,000.00) 2000 4000 6000 E  $(10,000.00) 0 0 12000 8.23 0 1 2 3 AMD  $(1,000,000.00)  400,000   400,000  300,000 NEC  $(1,500,000.00) 800,000 600,000 500,000 8.29 Year Sales Volume Selling Price Variable Cost of Production Inventory 1  10,000   $5.00   $3.00   15,000  2  12,000   $5.00   $3.10   12,000  3  13,000   $5.50   $3.25   13,000  4  15,000   $5.75   $3.25   15,000  5  20,000   $6.00   $3.30   20,000  6  25,000   $6.00   $3.40   25,000  7  20,000   $6.10   $3.50   20,000  8  18,000   $6.10   $3.50   18,000  9  15,000   $6.25   $3.50   15,000  10  15,000   $6.30   $3.75   10,000  Year Investment Revenue Var Cost of Prod Var Selling Exp 0  (100,000) 1  50,000   30,000   10,000  2  60,000   37,200   12,000  3  71,500   42,250   13,000  4  86,250   48,750   15,000 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/05/2009 for the course ORIE 350 taught by Professor Callister during the Summer '08 term at Cornell University (Engineering School).

Page1 / 4

hw 12 - 8.17 Project D B A C E 0 (10,000.00) (10,000.00)...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online