Notes - Business Process Design http/leeds-faculty.colorado.edu/hovorka Tools Process Technology = System-people Systems change Environment change

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Business Process Design 9/20/2007 12:17:00 PM http://leeds-faculty.colorado.edu/hovorka     Tools -  Process Technology = System  -people Systems change Environment change o Policy regulations o physical Strategy change Technology   magic bullet “we manage what we measure” analyze   stake holders o cost of design change increase exponentially as project progresses privacy   
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
help ( online)  what information is actually being submitted browsing convenience  stay at home compare accessibility distribution o physical limitations loss of ability to browse lack of inventory, saves holding costs shopping car abandonment what are the processes to not leave Water fall Model Process o Requirements o Design
Background image of page 2
o Implementation o Verification o Maintenance Structural Documented
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/04/2008 for the course SYST 3000 taught by Professor Adams,heat during the Spring '07 term at Colorado.

Page1 / 9

Notes - Business Process Design http/leeds-faculty.colorado.edu/hovorka Tools Process Technology = System-people Systems change Environment change

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online