Homework Assignment #1

Homework Assignment #1 - MIME 2600 Engineering Economics...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MIME 2600 – Engineering Economics Homework Assignment #1 Due on Friday, 1/25/08 Problem #1 – Given the following production possibilities schedule: Aircraft Carriers Scooters A 10 0 B 9 500 C 8 950 D 7 1300 E 6 1650 F 5 1950 G 4 2200 H 3 2400 I 2 2600 J 1 2750 K 0 2900 (a) Draw the production possibilities curve. (b) Determine the opportunity cost of producing 1 aircraft carrier. (c) Determine the opportunity cost of producing 1300 scooters. (d) Add point X for 5 aircraft carriers and 1000 scooters to your plot. Determine the opportunity cost of shifting from point X to point F. (e) Indicate what would happen to the production possibility curve if suddenly the supply of steel used in both products was reduced due to a large fire at the local steel mill. Problem #2 – Given the following economic data for 2 countries: GDP Real GDP Population Country A – 2000 $10,000,000 $10,000,000 2000 Country B – 2000 $200,000,000 $200,000,000 10000 Country A – 2005 $12,000,000 $10,500,000 2500
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/04/2008 for the course MIME 2600 taught by Professor Lewandowski during the Spring '08 term at Toledo.

Page1 / 2

Homework Assignment #1 - MIME 2600 Engineering Economics...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online