{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

IMG_4468.PNG - E Framing C F Roofing E G Electrical wiring...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: E Framing C F Roofing E G Electrical wiring E Installation of windows and 10 14 doors Ductwork and insulation I (including heating and cooling E units) Sheetrock, paneling, and 10 ll 12 paper hanging K Bricking F, G, H, J L Installation of cabinets F, G, H, J Inside trim (including fixtures) N Outside trim K 0 Painting M P Flooring N, O a ”U >—4 ENE—flH-nflflfl N HEN—flfl-—-fl S a nuannn-n-n E e Required: (a) Construct a network for this project. (b) Determine the expected time to complete this project. (c) Identify the critical path. (d) Determine ES, EF, LS, LF and Slack time for each activity. (e) What is the probability that the project will be completed in 58 days or less? (25 marks) /\ ...
View Full Document

{[ snackBarMessage ]}