Module 2 Part 1 Exam - Module 2 Exam Part I 1 The Test and Evaluation Master Plan(TEMP links together and must be consistent with which of the following

Module 2 Part 1 Exam - Module 2 Exam Part I 1 The Test and...

This preview shows page 1 - 3 out of 6 pages.

Module 2 Exam, Part I 1) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)? [Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.][Remediation Accessed :N] Systems Engineering Management Plan (SEMP) Initial Capabilities Document (ICD) Acquisition Program Baseline (APB) Lesson 2.5 Systems Threat Assessment (STA) 2) Which one of the following organizations would evaluate measures of effectiveness (MOEs) to determine how well a munitions system can perform its mission? [Identify the key T&E support organizations within DoD.][Remediation Accessed :N] Marine Corps Operational Test and Evaluation Activity (MCOTEA) Marine Corps Systems Command (MARCORSYSCOM) Lesson 2.5Defense Contract Management Agency (DCMA) Joint Interoperability Test Command (JITC) 3) Which one of the following test and evaluation (T&E) products is required at Milestone C? [Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.][Remediation Accessed :N] Operational Assessment (OA) Results Live Fire Test and Evaluation (LFT&E) Report Lesson 2.5
Background image
Early Operational Assessment (EOA) DOT&E Report on Initial Operational Test and Evaluation (IOT&E) 4) The operational effectiveness and operational suitability questions that must be addressed during Operational Test and Evaluation (OT&E) to assess the system's capability to perform its mission are called ___________. [Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.]Critical Operational Issues (COI) Critical Technical Parameters (CTP) Measures of Performance (MOP) Key Performance Parameters (KPP)
Background image
Image of page 3

You've reached the end of your free preview.

Want to read all 6 pages?

  • Fall '16
  • Acquisition Program Baseline, operational test, acquisition strategy, acquisition program, Operational Test & Evaluation

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture