Milling Process

Milling Process - Tomahawk Cruise Missile Intake Air Cover...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Tomahawk Cruise Missile Intake Air Cover Started as blank, pre-curved part Holes machined, outside beveled edge machined. 12 minutes machining time (included 5 minutes to bolt part once holes machined) Slotted holes are for explosive bolts Part rejected due to holes for latch out-of-tolerance Tomahawk Cruise Missile Intake Air Cover Hinge Material – Stainless steel Initial machining time – 12 hours/part Machine time after revision by programmer 1 hour 45 minutes Milling Process Chapter 24 Milling Process Peripheral or slab milling Surface is parallel with the axis of rotation of the cutter Usually performed on a horizontal milling machine Milling Process Equations for slab milling Cutting Speed V – speed in ft/min D – cutter diameter in inches...
View Full Document

This note was uploaded on 05/20/2008 for the course MET 153 taught by Professor Kohser during the Spring '08 term at Missouri S&T.

Page1 / 19

Milling Process - Tomahawk Cruise Missile Intake Air Cover...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online