HW1 solution

HW1 solution - BUAD 311 Homework 1 Process Analysis 1(20...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: BUAD 311 Homework 1: Process Analysis 1. (20 points) Trojan Pizza is known for its speedy delivery time of piping hot pizza. Its secret is to always maintain an inventory of uncooked yet assembled cheese pizzas and to only offer its customers cheese and pep- peroni pizzas. Immediately after receiving a pizza order, pepperoni is added to the pizza, if requested, and then the pizza is cooked and delivered. Draw the process diagram for Trojan Pizza. 2. (20 points) A clothing company produces five types of shirts, A, B, C, D, and E. The final manufacturing steps in the shirt production process are: • attach a care label to every shirt • brand the company's name on every shirt The company has one machine for attaching care labels and one machine for branding. For any shirt type, branding requires 6.5 minutes of processing time. Due to differences between shirt designs, attaching care labels requires the following shirt-dependent processing times: Shirt type Processing time A 4 B 10 C 5 D 6 E 8 The demand per day for the different shirt types is:...
View Full Document

This note was uploaded on 05/11/2008 for the course BUAD 311 taught by Professor Vaitsos during the Spring '07 term at USC.

Page1 / 2

HW1 solution - BUAD 311 Homework 1 Process Analysis 1(20...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online